TU Darmstadt / ULB / TUbiblio

Items in division

Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Date | Item Type | Language | No Grouping
Jump to: A | B | C | D | E | F | G | H | J | K | L | M | N | P | R | S | T | W | Z
Number of items at this level (without sub-levels): 309.

A

Arabmaldar, A. ; Sahoo, B.K. ; Ghiyasi, M. (2023)
A generalized robust data envelopment analysis model based on directional distance function.
In: European Journal of Operational Research, 311 (2)
doi: 10.1016/j.ejor.2023.05.005
Article

Akhundov, Najmaddin ; Tahirov, Nail ; Glock, C. H. (2022)
Optimal Scheduling of Waitstaff with Different Experience Levels at a Restaurant Chain.
In: Informs Journal on Applied Analytics, 52 (4)
doi: 10.1287/inte.2022.1124
Article

Arabmaldar, A. ; Mensah, E.K. ; Toloo, M. (2021)
Robust worst-practice interval DEA with non-discretionary factors.
In: Expert Systems with Applications, 182 (115256)
doi: 10.1016/j.eswa.2021.115256
Article

Abedinnia, Hamid ; Glock, C. H. ; Schneider, M. ; Grosse, E. H. (2017)
Machine scheduling problems in production: A tertiary study.
In: Computers & Industrial Engineering, 111
Article

AlDurgham, M. ; Adegbola, K. ; Glock, C. H. (2017)
A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate.
In: International Journal of Production Economics, 191
doi: 10.1016/j.ijpe.2017.05.017
Article

Arabmaldar, A. ; Jablonsky, J. ; Hosseinzadeh Saljooghi, F. (2017)
A new robust DEA model and super-efficiency measure.
In: Optimization : A Journal of Mathematical Programming and Operations Research, 66 (5)
doi: 10.1080/02331934.2017.1295047
Article

Abedinnia, Hamid ; Glock, C. H. ; Schneider, Michael (2017)
Machine scheduling in production: a content analysis.
In: Applied Mathematical Modelling, 50
doi: 10.1016/j.apm.2017.05.016
Article

Abedinnia, Hamid ; Moghaddamkia, Hoda ; Glock, C. H. (2016)
A joint economic lot size model under continuously increasing purchase prices of raw materials.
The 2016 International Supply Chain Management Symposium (SCMA). Niagara Falls, Kanada (14.-15.06.2016)
Conference or Workshop Item

Abedinnia, Hamid ; Glock, C. H. ; Brill, A (2016)
New Simple Constructive Heuristic Algorithms for Minimizing Total Flow-Time in the Permutation Flowshop Scheduling Problem.
In: Computers & Operations Research, 74
Article

Arikan, E. ; Fichtinger, J. ; Ries, J. M. (2014)
Impact of transportation lead-time variability on the economic and environmental performance of inventory systems.
In: International Journal of Production Economics, 157
Article

B

Best, J. ; Glock, C. H. ; Grosse, E. H. ; Rekik, Y. ; Syntetos, A (2022)
On the causes of positive inventory discrepancies in retail stores.
In: International Journal of Physical Distribution & Logistics Management, 52 (5/6)
doi: 10.1108/IJPDLM-07-2021-0291
Article

Battini, D. ; Finco, S ; Katiraee, N ; Grosse, E. H. ; Glock, C. H. (2021)
Active ageing workforce in manufacturing systems: an international discussion.
21st Triennial Congress of the International Ergonomics Association (IEA2021). Vancouver, Canada + Online
Conference or Workshop Item

Beck, F. G. ; Glock, C. H. (2021)
A dynamic programming approach for solving the economic lot scheduling problem with batch shipments.
In: International Journal of Operational Research, 40 (3)
doi: 10.1504/IJOR.2021.114305
Article

Beck, F. G. ; Glock, C. H. (2019)
The economic lot scheduling problem: a content analysis.
In: International Journal of Production Research, 58/2020 (11)
doi: 10.1080/00207543.2019.1668071
Article

Batarfi, R. ; Jaber, M. Y. ; Glock, C. H. (2019)
Pricing and inventory decisions in a dual channel supply chain with learning and forgetting.
In: Computers & Industrial Engineering, 136
doi: 10.1016/j.cie.2019.07.034
Article

Bartolini, M. ; Bottani, E. ; Grosse, E. H. (2019)
Green warehousing: systematic literature review and bibliometric analysis.
In: Journal of Cleaner Production, 226
doi: 10.1016/j.jclepro.2019.04.055
Article

Beck, Fabian Günter (2019)
An investigation of production and transportation policies for multi-item and multi-stage production systems.
Technische Universität Darmstadt
Ph.D. Thesis, Primary publication

Bier, Tobias ; Lange, Anne ; Glock, C. H. (2019)
Methods for mitigating disruptions in complex supply chain structures: A systematic literature review.
In: International Journal of Production Research, Volume 58 (6)
Article

Beck, F. G. ; Biel, K. ; Glock, C. H. (2019)
Integration of energy aspects into the economic lot scheduling Problem.
In: International Journal of Production Economics, 209
doi: 10.1016/j.ijpe.2018.02.012
Article

Biel, K. ; Zhao, F. ; Sutherland, J. ; Glock, C. H. (2018)
Flow shop scheduling with grid-integrated onsite wind power using stochastic MILP.
In: International Journal of Production Research, 56 (5)
Article

Biel, K. ; Glock, C. H. (2018)
Governing the dynamics of multi-stage production systems subject to learning and forgetting effects: A simulation study.
In: International Journal of Production Research, 56 (10)
Article

Beck, F. G. ; Glock, C. H. ; Kim, T. (2017)
Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments.
In: International Journal of Production Economics, 193
doi: 10.1016/j.ijpe.2017.07.015
Article

Behnisch, P. ; Glock, C. H. ; Grosse, E. H. ; Ries, J. M.
eds.: Glock, C. H. ; Grosse, E. H. (2017)
Auf dem Weg zum Warehouse 4.0? - Zum aktuellen Stand der Automatisierung in der Lagerhaltung.
In: Warehousing 4.0 - Technische Lösungen und Managementkonzepte für die Lagerlogistik der Zukunft
Book Section

Biel, K. ; Glock, C. H. (2017)
Prerequisites of efficient decentralized waste heat recovery and energy storage in production planning.
In: Journal of Business Economics, 87 (1)
Article

Biel, Konstantin (2017)
Multi-stage production planning with special consideration of energy supply and demand.
Technische Universität Darmstadt
Ph.D. Thesis, Primary publication

Biel, K. ; Ellenrieder, D. ; Kiesel, F. ; Ries, J. M. (2016)
Analysis of mergers and acquisitions in the airline industry - Learning from investor reactions.
In: Supply Chain Management, 16 (2)
Article

Biel, K. ; Glock, C. H. (2016)
On the use of waste heat in a two-stage production system with controllable production rates.
In: International Journal of Production Economics, 181
Article

Biel, K. ; Glock, C. H. (2016)
Systematic literature review of decision support models for energy-efficient production planning.
In: Computers & Industrial Engineering, 101
Article

Broens, M. ; Grosse, E. H. (2016)
Best Practices für den Einkauf von Leistungen und Produkten.
In: innovative VERWALTUNG, 38 (5)
Article

Beck, F. G. ; Glock, C. H. (2016)
The impact of batch shipments on the economic lot scheduling problem.
In: Computers & Industrial Engineering, 96
Article

Battini, D. ; Glock, C. H. ; Grosse, E. H. ; Persona, A. ; Sgarbossa, F. (2016)
An integrated approach to include ergonomics in lot-sizing decisions.
Nineteenth International Working Seminar on Production Economics. Innsbruck (22.-26.02.2016)
Conference or Workshop Item

Battini, D. ; Glock, C. H. ; Grosse, E. H. ; Persona, A. ; Sgarbossa, F. (2016)
Human energy expenditure in order picking storage assignment: a bi-objective method.
In: Computers & Industrial Engineering, 94
Article

Beck, F. G. ; Glock, C. H.
eds.: Dessouky, Mohamed I. ; Kacem, Imed (2016)
The impact of batch shipments on the economic lot scheduling problem.
International Conference on Computers & Industrial Engineering, CIE45. Metz (28. - 30.10.2015)
Conference or Workshop Item

Broens, M. G. ; Grosse, E. H. ; Glock, C. H.
eds.: Broens, M. G. ; Glock, C. H. ; Grosse, E. H. (2015)
Status quo der öffentlichen Beschaffung und die Rolle von Best Practices.
In: Best Practices bei der Beschaffung ausgewählter Bedarfe: Von der Abfallentsorgung bis zum Winterdienst
Book Section

Beck, F. G. ; Grosse, E. H. ; Teßmann, R. (2015)
An extension for dynamic lot sizing heuristics.
In: Production & Manufacturing Research, 3 (1)
Article

Battini, D. ; Glock, C. H. ; Grosse, E. H. ; Persona, A. ; Sgarbossa, F. (2015)
Ergo-Lot-Sizing: Considering Ergonomics in Lot-Sizing Decisions.
In: IFAC-PapersOnLine, 48 (3)
Article

Biel, K. ; Ries, J. M. (2015)
Recent advances in operations research towards efficient airline management.
In: Supply Chain Management, (III/2015)
Article

Beck, Fabian G. ; Ries, Jörg M. ; Urnauer, Christian (2015)
Dynamische Losgrößenplanung in ERP-Systemen: Eine Performanceanalyse von Heuristiken der Fertigungs- und Bestellmengenplanung für unterschiedliche Bedarfsstrukturen.
In: Zeitschrift für Wirtschaftlichen Fabrikbetrieb : ZWF, 110 (5)
Article

Biel, K. ; Glock, C. H. (2014)
Coordination of moving bottlenecks in a multi-stage production system: A simulation study.
18th International Working Seminar on Production Economics. Innsbruck (24.02. - 28.02.2014)
Conference or Workshop Item

Biel, K. ; Glock, C. H. (2014)
On the use of waste energy in a two-stage production system with controllable production rates.
18th International Symposium on Inventories. Budapest (18.08. - 22.08.2014)
Conference or Workshop Item

Broens, M. G. ; Glock, C. H. (2013)
Wege zur elektronischen Vergabe.
In: Kommunaler Beschaffungsdienst, 33 (10)
Article

Broens, M. G. ; Glock, C. H. (2013)
Barrieren abbauen.
In: Kommune 21, 13 (7)
Article

Broens, M. ; Glock, C. H. ; Weichert, C. (2012)
Einsatzmöglichkeiten für elektronische Beschaffungslösungen in der Privatwirtschaft und in der öffentlichen Verwaltung.
In: Public e Procurement - Grundlagen, Perspektiven und Implementierungshilfen
Book Section

Broens, M. ; Glock, C. H. ; Curtaz, C. (2012)
Hinderungsgründe für den Einsatz der elektronischen Vergabe in der öffentlichen Verwaltung.
In: Public eProcurement - Grundlagen, Perspektiven und Implementierungshilfen
Book Section

Broens, M. ; Glock, C. H. (2011)
Wissensmanagement mittels Web 2.0-Anwendungen - Potenziale und Erfolgsfaktoren aus Sicht der öffentlichen Verwaltung.
In: Neues Verwaltungsmanagement, 2 (13)
Article

Bogaschewsky, R. ; Glock, C. H. (2009)
Rational inefficiencies in lot-sizing models with learning effects.
In: Zeitschrift für Betriebswirtschaft, (4)
Article

Bogaschewsky, R. ; Glock, C. H. (2009)
Organisationskosten im Einkauf - eine institutionenökonomisch fundierte Analyse.
Conference or Workshop Item

Broens, M. ; Glock, C. H. (2008)
Erfolgspotenziale in der öffentlichen Beschaffung.
In: eGovernment Kompendium 2009
Book Section

Bogaschewsky, R. ; Glock, C. H. ; Broens, M. (2007)
Wie sich Kommunen gegenseitig helfen können: Austausch von Leistungsbeschreibungen über Internet-Plattform.
In: apf-Ausbildung - Prüfung - Fortbildung, 33 (11)
Article

Bogaschewsky, R. ; Glock, C. H. ; Broens, M. (2007)
Effizienzsteigerung bei öffentlichen Vergabeprozessen.
In: Innovative Verwaltung, 29 (10)
Article

Bogaschewsky, R. ; Glock, C. H. ; Broens, M. (2007)
Austausch von Leistungsbeschreibungen: Ein einfacher Weg zur Effizienzsteigerung im öffentlichen Auftragswesen.
In: Kommunaler Beschaffungsdienst, 26 (7-8)
Article

C

Castellano, D. ; Glock, C.H. (2022)
Economic production quantity with inventory rationing for a decaying item.
10th IFAC Conference on Manufacturing Modelling, Management and Control (MIM 2022). Nantes, France (22-24 June 2022)
doi: 10.1016/j.ifacol.2022.10.188
Conference or Workshop Item

Castellano, D. ; Glock, C. H. (2021)
The average-cost formulation of lot sizing models and inventory carrying charges: a technical note.
In: Operations Management Research, 2021 (14)
doi: 10.1007/s12063-021-00191-2
Article

Calzavara, M. ; Glock, C. H. ; Grosse, E. H. ; Sgarbossa, F. (2019)
An integrated storage assignment method for manual order picking warehouses considering cost, workload and posture.
In: International Journal of Production Research, 57 (8)
doi: 10.1080/00207543.2018.1518609
Article

Calzavara, M. ; Sgarbossa, F. ; Grosse, E. H. ; Glock, C. H.
eds.: Bousonville, T. ; Melo, T. ; Rezg, N. ; Vernadat, F. (2017)
Analytical models for a joint posture and fatigue analysis in order picking.
Proceedings of the International Conference on Industrial Engineering and Systems Management, IESM 2017. Saarbrücken (11. - 13. Oktober 2017)
Conference or Workshop Item

Calzavara, M. ; Sgarbossa, F. ; Persona, A. ; Glock, C. H. ; Grosse, E. H.
eds.: Glock, C. H. ; Grosse, E. H. (2017)
Vergleich unterschiedlicher papierloser Kommissioniersysteme.
In: Warehousing 4.0 - Technische Lösungen und Managementkonzepte für die Lagerlogistik der Zukunft
Book Section

Calzavara, M. ; Glock, C. H. ; Grosse, E. H. ; Persona, A. ; Sgarbossa, F. (2017)
Analysis of economic and ergonomic performance measures of different rack layouts in an order picking warehouse.
In: Computers & Industrial Engineering, 111
doi: 10.1016/j.cie.2016.07.001
Article

Calzavara, M. ; Glock, C. H. ; Grosse, E. H. ; Persona, A. ; Sgarbossa, F. (2016)
Models for an ergonomic evaluation of order picking from different rack layouts.
In: IFAC-PapersOnLine, 49 (12)
Article

D

Diefenbach, H. ; Steinebach, T. ; Glock, C. H. ; Grosse, E.H. ; Wakula, J. (2023)
Wie lassen sich körperliche Belastungen in der Kommissionierung quantifizieren?
In: Betriebliche Prävention, 135 (3/23)
doi: 10.37307/j.2365-7634.2023.03.04
Article

Diefenbach, Heiko ; Emde, Simon ; Glock, C. H. (2023)
Multi-depot electric vehicle scheduling in in-plant production logistics considering non-linear charging models.
In: European Journal of Operational Research, 306 (2)
doi: 10.1016/j.ejor.2022.06.050
Article

Diefenbach, H. ; Emde, S. ; Glock, C. H. ; Grosse, E. H. (2022)
New solution procedures for the order picker routing problem in U-shaped pick areas with a movable depot.
In: OR Spectrum, 44 (2)
doi: 10.1007/s00291-021-00663-8
Article

Diefenbach, H. ; Erlemann, N. ; Lunin, A ; Grosse, E.H. ; Schocke, K.-O. ; Glock, C.H. (2021)
Improving processes and ergonomics at air freight handling agents: a case study.
In: International Journal of Logistics Research and Applications, 26 (4)
doi: 10.1080/13675567.2021.1958305
Article

Diefenbach, H. ; Erlemann, N. ; Lunin, A. ; Grosse, E. H. ; Schocke, K.-O. ; Glock, C. H. (2021)
An analysis of processes and economic as well as ergonomic improvement potentials at air freight forwarders.
5th Interdisciplinary Conference on Production, Logistics and Traffic (ICPLT). Darmstadt, Virtual Conference (17.-18.03.2021)
Conference or Workshop Item

Diefenbach, H. ; Erlemann, N. ; Lunin, A. ; Grosse, E.H. ; Schocke, K.-O. ; Glock, C. H. (2020)
Physische Belastungen und mögliche Gegenmaßnahmen in der Luftfrachtabfertigung.
In: Betriebliche Prävention, 133 (01/21)
doi: 10.37307/j.2365-7634.2021.01.05
Article

Diefenbach, H. ; Glock, C. H. (2020)
Ökonomisch und ergonomisch optimierte Gestaltung von U-förmigen Kommissionierlagern.
In: ZWF - Zeitschrift für wirtschaftlichen Fabrikbetrieb, 115 (9)
doi: 10.3139/104.112167
Article

Diefenbach, Heiko ; Emde, Simon ; Glock, C. H. (2020)
Loading tow trains ergonomically for just-in-time part supply.
In: European Journal of Operational Research, 284 (1)
doi: 10.1016/j.ejor.2019.12.009
Article

Diefenbach, Heiko ; Glock, C. H. (2019)
Ergonomic and economic optimization of layout and item assignment of a U-shaped order picking zone.
In: Computers & Industrial Engineering, (138)
doi: 10.1016/j.cie.2019.106094
Article

E

Elbert, R. ; Glock, C. H. ; Weidinger, F. ; Pisch, F. ; Pfohl, H.-C. (2022)
Intelligente Lösungen auf Lager - Innovationen für die riesigen Warenversanddepots.
In: hoch3. Die Zeitung der TU Darmstadt, 18 (3)
Article

Erlemann, N. ; Diefenbach, H. ; Lunin, A. ; Grosse, E.-H. ; Glock, C. H. ; Schocke, K.-O. (2021)
So wird die Luftfracht effizienter: Prozessineffizienzen und mögliche Gegenmaßnahmen in der Luftfrachtabfertigung.
In: Logistik für Unternehmen
Article

Emde, S. ; Tahirov, N. ; Gendreau, M. ; Glock, C. H. (2021)
Routing automated lane-guided transport vehicles in a warehouse handling returns.
In: European Journal of Operational Research, 292
doi: 10.1016/j.ejor.2020.11.038
Article

Emde, Simon ; Abedinnia, Hamid ; Lange, Anne ; Glock, C. H. (2020)
Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space.
In: OR Spectrum, 42
Article

Emde, Simon ; Abedinnia, Hamid ; Glock, C. H. (2018)
Scheduling electric vehicles making milk-runs for just-in-time delivery.
In: IISE Transactions
doi: 10.1080/24725854.2018.1479899
Article

Ehsani, E. ; Kazemi, N. ; Olugu, E. U. ; Grosse, E. H. ; Schwindl, K. (2017)
Applying fuzzy multi-objective linear programming to a project management decision with nonlinear fuzzy membership functions.
In: Neural Computing and Applications, 28 (8)
Article

Elbert, R. ; Franzke, T. ; Glock, C. H. ; Grosse, E. H. (2017)
The effects of human behavior on the efficiency of routing policies in order picking: the case of route deviations.
In: Computers & Industrial Engineering, 111
doi: 10.1016/J.CIE.2016.11.033
Article

Elbert, R. ; Franzke, T. ; Glock, C. H. ; Grosse, E. H. (2015)
Picker Blocking in manuellen Kommissioniersystemen - Eine simulationsbasierte Analyse.
In: Simulation in Produktion und Logistik / hrsg. von S. Wenzel ; T. Peter
Book Section

Elbert, R. ; Franzke, T. ; Glock, C. H. ; Grosse, E. H. (2015)
Agent-based Analysis of Picker Blocking in Manual Order Picking Systems: Effects of Routing Combinations on Throughput Time.
In: Proceedings of the 2015 Winter Simulation Conference / ed. by L. Yilmaz et al
Book Section

F

Füchtenhans, M. ; Glock, C.H. (2023)
Laststeuerungsprogramme am Beispiel der Maschinenbelegungsplanung.
In: ZWF - Zeitschrift für wirtschaftlichen Fabrikbetrieb, 118 (7-8)
doi: 10.1515/zwf-2023-1082
Article

Füchtenhans, M. ; Glock, C.H.
Arten und Nutzenpotenziale von Laststeuerungsprogrammen.
In: PERSPEKTIVEN. Die Fachpublikation des House of Energy., 2022/2023
Article

Füchtenhans, M. ; Glock, C.H. ; Grosse, E.H. ; Zanoni, S. (2023)
Using smart lighting systems to reduce energy costs in warehouses: A simulation study.
In: International Journal of Logistics Research and Applications, 26 (1)
doi: 10.1080/13675567.2021.1937967
Article

Füchtenhans, M. ; Glock, C.H. (2022)
Energy-efficient job shop scheduling considering processing speed and incentive-based programs.
10th IFAC Conference on Manufacturing Modelling, Management and Control (MIM 2022). Nantes, France (22-24 June 2022)
doi: 10.1016/j.ifacol.2022.09.389
Conference or Workshop Item

Füchtenhans, M. ; Grosse, E. H. ; Glock, C. H. (2021)
Smart lighting systems: state-of-the-art and potential applications in warehouse order picking.
In: International Journal of Production Research, 59 (12)
doi: 10.1080/00207543.2021.1897177
Article

Füchtenhans, M. ; Grosse, E. H. ; Glock, C. H. (2020)
Verbesserung der Energieeffizienz im Lager durch intelligente Beleuchtungssysteme.
In: ZWF - Zeitschrift für wirtschaftlichen Fabrikbetrieb, 115 (4)
doi: 10.3139/104.112263
Article

Füchtenhans, M. ; Grosse, E. H. ; Glock, C. H. (2019)
Use cases and potentials of smart lighting systems in industrial settings.
In: IEEE Engineering Management Review, 47 (4)
doi: 10.1109/EMR.2019.2947371
Article

Fontana Granotto, G. ; Sgarbossa, F. ; Glock, C. H. ; Grosse, E. H. (2019)
The Effect of Worker Fatigue on the Performance of a Bucket Brigade Order Picking System.
9th IFAC Conference on Manufacturing Modelling, Management and Control (MIM 2019). (28.-30. August 2019)
Conference or Workshop Item

Füchtenhans, M. ; Grosse, E. H. ; Glock, C. H. (2019)
Applications for smart lighting systems in production and logistics: a structured literature review.
9th IFAC Conference on Manufacturing Modelling, Management and Control (MIM 2019). (28.-30. August 2019)
Conference or Workshop Item

Füchtenhans, M. ; Glock, C. H. ; Grosse, E. H. ; Schmidt, Kevin (2019)
Intelligente Beleuchtung mit Anwendungspotenzial.
In: MM LOGISTIK, (4/2019)
Article

Feldman, A. ; Neumann, W. P. ; Grosse, E. H. ; Glock, C. H. (2019)
The use of assistive devices for manual materials handling in warehouses: a systematic literature review.
The 24th International Symposium on Logistics (ISL 2019). (14.-17.07.2019)
Conference or Workshop Item

Füchtenhans, M. ; Glock, C. H. ; Grosse, E. H. ; Dagdagan, G. (2019)
Reducing energy cost in warehouses via smart lighting systems: a simulation study.
The 24th International Symposium on Logistics (ISL 2019). (14.-17.07.2019)
Conference or Workshop Item

Füchtenhans, M. ; Grosse, E. H. ; Glock, C. H. (2019)
Literature review on smart lighting systems and their application in industrial settings.
6th International Conference on Control, Decision and Information Technologies. Paris, France (23.-26.04.2019)
Conference or Workshop Item

Füchtenhans, M. ; Schmidt, Kevin ; Grosse, E. H. ; Glock, C. H. (2019)
Nutzenpotenziale intelligenter Beleuchtungssysteme für Fabrikbetriebe.
In: Fabriksoftware, 24 (1)
doi: 10.30844/FS19-1_21-24
Article

Franzke, T. ; Grosse, E. H. ; Glock, C. H. ; Elbert, R. (2017)
An investigation of the effects of storage assignment and picker routing on the occurrence of picker blocking in manual picker-to-parts warehouses.
In: The International Journal of Logistics Management, 28 (3)
Article

Fichtinger, J. ; Ries, J. M. ; Grosse, E. H. ; Baker, P. (2015)
Assessing the environmental impact of integrated inventory and warehouse management.
In: International Journal of Production Economics, 170 (Part C)
Article

Franzke, T. ; Grosse, E. H. ; Glock, C. H. ; Elbert, R. (2015)
An Agent-Based Simulation Approach for Evaluating the Effects of Picker Blocking in a Rectangular Warehouse.
International Symposium on Logistics 2015. Bologna, Italien
Conference or Workshop Item

G

Giri, B. C. ; Glock, C. H. (2022)
The bullwhip effect in a manufacturing/remanufacturing supply chain under a price-induced non-standard ARMA(1,1) demand process.
In: European Journal of Operational Research, 301 (2)
doi: 10.1016/j.ejor.2021.10.025
Article

Goltsos, T. .E. ; Syntetos, A ; Glock, C. H. ; Ioannou, G (2022)
Inventory – forecasting: Mind the gap.
In: European Journal of Operational Research, 299 (2)
doi: 10.1016/j.ejor.2021.07.040
Article

Glock, C. H. ; Grosse, E. H.
eds.: Chibanguza, K ; Kuß, C ; Steege, H (2022)
Integration von Drohnen in betriebswirtschaftliche Prozesse am Beispiel der Logistik.
In: Künstliche Intelligenz – Recht und Praxis automatisierter und autonomer Systeme.
Book Section

Glock, C. H. (2021)
Production and Supply Chain Management. An Introduction.
Book

Glock, C. H. ; Grosse, E. H. ; Neumann, W. P. ; Feldmann, A. (2020)
Assistive devices for manual materials handling in warehouses: a systematic literature review.
In: International Journal of Production Research, 59/2021 (11)
doi: 10.1080/00207543.2020.1853845
Article

Glock, C. H. (2020)
Ein bisschen Schwund ist immer- Wie sich fehlerhafte Daten von Lagerbeständen auf Unternehmen wirtschaftlich auswirken.
In: Best in Procurement BIP, 11 (2)
Article

Glock, C. H. (2020)
Zahlt sich Datenqualität aus?
In: Logistik Heute, 42 (3)
Article

Glock, C. H. ; Rekik, Y. ; Ries, J. M. (2020)
A coordination mechanism for supply chains with capacity expansions and order-dependent lead times.
In: European Journal of Operational Research, 185 (1)
Article

Glock, C. H. ; Grosse, E. H. (2020)
The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature.
In: European Journal of Operational Research, 288 (3)
doi: 10.1016/j.ejor.2020.05.033
Article

Glock, C. H. ; Grosse, E. H. ; Jaber, M. Y. ; Smunt, T. L. (2019)
Applications of learning curves in production and operations management: A systematic literature review.
In: Computers & Industrial Engineering, 131
Article

Glock, C. H. ; Grosse, E. H. ; Jaber, M. Y. ; Smunt, T. L. (2019)
Editorial: Novel applications of learning curves in production planning and logistics.
In: Computers & Industrial Engineering, 131
Article

Glock, C. H. ; Grosse, E. H. ; Abedinnia, Hamid ; Emde, Simon (2019)
An integrated model to improve ergonomic and economic performance in order picking by rotating pallets.
In: European Journal of Operational Research, (271)
Article

Glock, C. H. ; Grosse, E. H. ; Kim, T. ; Neumann, W. P. ; Sobhani, A. (2019)
An integrated cost and worker fatigue evaluation model of a packaging process.
In: International Journal of Production Economics, 207
Article

Glock, C. H. ; Rekik, Y. ; Syntetos, A. (2019)
Modelling (and learning from) inventory inaccuracies in e-retailing/B2B contexts.
In: Decision Sciences, 50 (6)
doi: 10.1111/deci.12367
Article

Glock, C. H. ; Grosse, E. H. ; Jaber, M. Y. ; Smunt, T. L. (2019)
Applications of learning curves in production and operations management: A systematic literature review.
In: Computers & Industrial Engineering, 131
doi: 10.1016/j.cie.2018.10.030
Article

Glock, C. H. ; Grosse, E. H. (2018)
The influence of variable production rates on the lot-sizing decision: a structured review of the literature.
Twentieth International Working Seminar on Production Economics. Innsbruck, Österreich (19.-23. Februar 2018)
Conference or Workshop Item

Glock, C. H. ; Grosse, E. H. ; Ries, J. M. (2017)
Decision support models for supplier development: systematic literature review and research agenda.
In: International Journal of Production Economics, 193
Article

Glock, C. H. ; Grosse, E. H. ; Neumann, W. P. ; Sgarbossa, F. (2017)
Editorial: Human factors in industrial and logistic system design.
In: Computers & Industrial Engineering, 111
doi: 10.1016/J.CIE.2017.08.014
Article

Giri, B. C. ; Glock, C. H. (2017)
A closed-loop supply chain with stochastic product returns and worker experience under learning and forgetting.
In: International Journal of Production Research, 55 (22)
doi: 10.1080/00207543.2017.1347301
Article

Grosse, E. H. ; Calzavara, M. ; Glock, C. H. ; Sgarbossa, F. (2017)
Incorporating human factors into decision support models for production and logistics: current state of research.
In: IFAC-PapersOnLine, 50 (1)
Article

Glock, C. H. ; Grosse, E. H. ; Broens, M.
eds.: Glock, C. H. ; Grosse, E. H. (2017)
Verbesserung der Arbeitsplatzqualität in der Lagerhaltung durch ergonomische Arbeitsplatzgestaltung.
In: Warehousing 4.0 - Technische Lösungen und Managementkonzepte für die Lagerlogistik der Zukunft
Book Section

Glock, C. H. (2017)
Decision support models for managing returnable transport items in supply chains: A systematic literature review.
In: International Journal of Production Economics, 183 (B)
Article

Grosse, E. H. ; Glock, C. H. ; Neumann, W. P. (2017)
Human factors in order picking: a content analysis of the literature.
In: International Journal of Production Research, 55 (5)
Article

Glock, C. H. ; Grosse, E. H. ; Elbert, R. ; Franzke, T. (2017)
Maverick picking: The impact of modifications in work schedules on manual order picking processes.
In: International Journal of Production Research, 55 (21)
doi: 10.1080/00207543.2016.1252862
Article

Glock, C. H. ; Lange, Anne ; Grosse, E. H. ; Das, A. (2017)
Celebrating the 10th volume of IJISM: A bibliographic review and outlook.
In: International Journal of Integrated Supply Management, 11 (4)
Article

Glock, C. H. ; Kim, T. (2016)
Safety measures in the joint economic lot size model with returnable transport items.
In: International Journal of Production Economics, 181
Article

Glock, C. H. ; Grosse, E. H. ; Neumann, W. P. (2016)
The role of human errors in manual materials handling: the case of order picking.
The 2016 International Supply Chain Management Symposium. Niagara Falls, Kanada (14. - 15. Juni)
Conference or Workshop Item

Glock, C. H. (2016)
Training suppliers by delegating workers: A decision support model.
In: Computers & Industrial Engineering, 93
doi: 10.1016/j.cie.2016.01.005
Article

Glock, C. H. ; Grosse, E. H. ; Ries, J. M. (2016)
Decision support models for supplier development: systematic literature review and research agenda.
Nineteenth International Working Seminar on Production Economics. Innsbruck (22.-26.02.2016)
Conference or Workshop Item

Grosse, E. H. ; Dixon, S. M. ; Neumann, W. P. ; Glock, C. H. (2016)
Using qualitative interviewing to examine human factors in warehouse order picking: technical note.
In: International Journal of Logistics Systems and Management, 23 (4)
Article

Grosse, E. H. ; Glock, C. H. (2015)
The effect of worker learning on manual order picking processes.
In: International Journal of Production Economics, 170 (Part C)
Article

Grosse, E. H. ; Glock, C. H. ; Müller, Seb. (2015)
Production economics and the learning curve: A Meta-Analysis.
In: International Journal of Production Economics, 170 (Part B)
Article

Glock, C. H. ; Calzavara, M. ; Grosse, E. H. ; Sgarbossa, F. (2015)
The impact of alternative rack layouts on economic and ergonomic performance measures in order picking.
International Symposium on Logistics 2015. Bologna, Italien
Conference or Workshop Item

Glock, C. H. ; Elbert, R. ; Grosse, E. H. ; Franzke, T. (2015)
Effizienter Kommissionieren.
In: Deutsche Verkehrszeitung, (36)
Article

Glock, C. H. ; Schwindl, K. ; Ries, J. M. (2015)
Ordering policy for stock-dependent demand under progressive payment scheme: a comment.
In: International Journal of Systems Science, 46 (5)
Article

Grosse, E. H. ; Glock, C. H. ; Jaber, M. Y. ; Neumann, W. P. (2015)
Incorporating human factors in order picking planning models: framework and research opportunities.
In: International Journal of Production Research, 53 (3)
Article

Glock, C. H. ; Kim, T. (2015)
Coordinating a supply chain with a heterogeneous vehicle fleet under greenhouse gas emissions.
In: International Journal of Logistics Management, 26 (3)
Article

Glock, C. H. ; Kim, T. (2015)
A joint economic lot size model with returnable transport items.
In: International Journal of Integrated Supply Management, 9 (3)
Article

Glock, C. H. ; Kim, T. (2015)
The effect of forward integration on a single-vendor-multi-retailer supply chain under retailer competition.
In: International Journal of Production Economics, (164)
doi: 10.1016/j.ijpe.2015.03.009
Article

Gans, F. ; Biel, K. ; Glock, C. H. (2015)
Losgrößenplanung in einem Presswerk mithilfe gemischt-ganzzahliger Programmierung.
In: Zeitschrift für Wirtschaftlichen Fabrikbetrieb, 110 (4)
Article

Glock, C. H. ; Grosse, E. H. (2015)
Decision support models for production ramp-up: A systematic literature review.
In: International Journal of Production Research, 53 (21)
Article

Grosse, E. H. (2015)
Human factors in order picking systems – A framework for integrating human factors in order picking planning models with an in-depth analysis of learning effects.
Technische Universität Darmstadt
Ph.D. Thesis

Glock, C. H. ; Abedinnia, Hamid (2015)
Decomposing bills of materials using the Gozinto-list-method.
In: International Journal of Information and Operations Management Education, 6 (1)
Article

Grosse, E. H. ; Glock, C. H. ; Neumann, W. P. (2015)
Human Factors in Order Picking System Design: A Content Analysis.
In: IFAC-PapersOnLine, 48 (3)
Article

Grosse, E. H. (2014)
Berücksichtigung von menschlichen Faktoren in Prozessen der Kommissionierung.
Herbst-Tagung der Wissenschaftlichen Kommission Produktion ‎des VHB . Hagen (07.11.2014)
Conference or Workshop Item

Grosse, E. H. ; Glock, C. H. ; Lonzer, A. (2014)
Planung von effizienten Kommissionierprozessen mit Excel-Spreadsheets.
In: Zeitschrift für wirtschaftlichen Fabrikbetrieb, 109 (7-8)
Article

Grosse, E. H. ; Glock, C. H. ; Müller, Seb. (2014)
Production Economics and the Learning Curve: A Meta-Analysis.
Eighteenth International Working Seminar on Production Economics. Innsbruck (24.02. - 28.02.2014)
Conference or Workshop Item

Glock, C. H. ; Jaber, M. Y. (2014)
A group learning curve model with and without worker turnover.
In: Journal of Modelling in Management, 9 (2)
Article

Glock, C. H. ; Schwindl, K. ; Ries, J. M. (2014)
A note on: Optimal ordering policy for stock-dependent demand under progressive payment scheme.
In: European Journal of Operational Research, 232 (2)
Article

Glock, C. H. ; Kim, T. (2014)
Container management in a single-vendor-multiple-buyer supply chain.
In: Logistics Research, 7 (112)
Article

Glock, C. H. ; Grosse, E. H. ; Ries, J. M. (2014)
The Lot Sizing Problem: A Tertiary Study.
In: International Journal of Production Economics, 155 (1-3)
Article

Glock, C. H. ; Kim, T. (2014)
Shipment consolidation in a multi-vendor-single-buyer integrated inventory model.
In: Computers & Industrial Engineering, 70 (4)
Article

Glock, C. H. (2014)
Mathematische Planungsmodelle verbessern Effizienz der Logistikkette.
In: BIP - Best in Procurement, 5 (1)
Article

Grosse, E. H. ; Glock, C. H. ; Ballester-Ripoll, R. (2014)
A simulated annealing approach for the joint order batching and order picker routing problem with weight restrictions.
In: International Journal of Operations and Quantitative Management, 20 (2)
Article

Glock, C. H. (2014)
Produktion und Supply Chain Management. Eine Einführung.
Book

Grosse, E. H. ; Glock, C. H. ; Jaber, M. Y. (2013)
The effect of worker learning and forgetting on storage reassignment decisions in order picking systems.
In: Computers & Industrial Engineering, 66 (4)
Article

Grosse, E. H. (2013)
Optimierung der Kommissionierung in u-förmigen Lagerbereichen.
IWA-Symposium Produktion und Logistik in der Automobilindustrie „Theory meets Practice“ 2013. Jena (14.06.2013)
Conference or Workshop Item

Glock, C. H. ; Jaber, M. Y. (2013)
A multi-stage production-inventory model with learning and forgetting effects, rework and scrap.
In: Computers & Industrial Engineering, 64 (2)
Article

Glock, C. H. ; Jaber, M. Y. ; El Saadany, A. (2013)
Supply Chain Coordination with Emission Reduction Incentives.
In: International Journal of Production Research, 51 (1)
Article

Glock, C. H. ; Ries, J. M. (2013)
Reducing lead-time risk through multiple sourcing: the case of stochastic demand and variable lead-time (angenommen).
In: International Journal of Production Research, 51 (1)
Article

Glock, C. H. ; Broens, M. G. (2013)
Size and Structure in the Purchasing Function: Evidence from German Municipalities (angenommen).
In: Journal of Public Procurement, 13 (1)
Article

Grosse, E. H. ; Glock, C. H. (2013)
An experimental investigation of learning effects in order picking systems.
In: Journal of Manufacturing Technology Management, 24 (6)
Article

Glock, C. H. ; Jaber, M. Y. (2013)
An economic production quantity (EPQ) model for a customer-dominated supply chain with defective items, reworking and scrap.
In: International Journal of Services and Operations Management, 14 (2)
Article

Grosse, E. H. ; Glock, C. H. (2013)
Menschliche Faktoren in der Kommissionierung.
In: Zeitschrift für wirtschaftlichen Fabrikbetrieb, 108 (4)
Article

Glock, C. H. ; Kim, T. (2013)
Coordinating a supply chain with a heterogeneous vehicle fleet under greenhouse gas emissions.
Conference or Workshop Item

Glock, C. H. (2013)
The machine breakdown paradox: How random shifts in the production rate may increase company profits.
In: Computers & Industrial Engineering, 66 (4)
Article

Glock, C. H. ; Broens, M. G. (2013)
Verwaltung 2030 Managementkonzepte für die Verwaltung von morgen.
Book

Glock, C. H. ; Jaber, M. Y. (2013)
Learning effects and the phenomenon of moving bottlenecks in a two-stage production system.
In: Applied Mathematical Modelling, 37 (18-19)
Article

Glock, C. H. ; Kim, T. (2012)
A joint economic lot sizemodel with returnable transport items.
17th International Symposium on Inventories. Budapest (20.-24. August 2012)
Conference or Workshop Item

Glock, C. H. ; Ries, J. M. (2012)
A newsvendor model with dual sourcing under risk aversion and order-dependent lead times.
17th International Symposium on Inventories. Budapest (20.-24. August 2012)
Conference or Workshop Item

Glock, C. H. ; Grosse, E. H. ; Ballester-Ripoll, R. (2012)
A simulated annealing approach for improving order batching in manual order picking systems.
17th International Symposium on Inventories. Budapest (20.-24. August 2012)
Conference or Workshop Item

Glock, C. H. ; Ries, J. M. (2012)
Channel Coordination and Variance Reduction in a Newsvendor Setting.
In: International Journal of Services and Operations Management, 12 (3)
Article

Glock, C. H. ; Schwindl, K. ; Jaber, M. Y. (2012)
An EOQ Model with Fuzzy Demand and Learning in Fuzziness.
In: International Journal of Services and Operations Management, 12 (1)
Article

Glock, C. H. (2012)
A comparison of alternative delivery structures in a dual sourcing environment.
In: International Journal of Production Research, 50 (11)
Article

Grosse, E. H. ; Glock, C. H. (2012)
Lerneffekte in der Kommissionierung.
In: Zeitschrift für wirtschaftlichen Fabrikbetrieb, (04/2012)
Article

Glock, C. H. ; Grosse, E. H. (2012)
Storage policies and order picking strategies in U-shaped order-picking systems with a movable base.
In: International Journal of Production Research, 50 (16)
Article

Glock, C. H. (2012)
The joint economic lot size problem: a review.
In: International Journal of Production Economics, 135 (2)
Article

Glock, C. H. (2012)
Coordination of a production network with a single buyer and multiple vendors.
In: International Journal of Production Economics, 135 (2)
Article

Glock, C. H. (2012)
Single sourcing versus dual sourcing under conditions of learning.
In: Computers & Industrial Engineering, 62 (1)
Article

Glock, C. H. (2012)
Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand.
In: International Journal of Production Economics, 136 (1)
Article

Glock, C. H. ; Jaber, M. Y. ; Zolfaghari, S. (2012)
Production planning for a ramp-up process with learning in production and growth in demand.
In: International Journal of Production Research, 50 (20)
Article

Glock, C. H. ; Jaber, M. Y. ; Searcy, C. (2012)
Sustainability strategies in an EPQ model with price- and quality-sensitive demand.
In: International Journal of Logistics Management, 2 (3)
Article

Glock, C. H. ; Hochrein, S. (2011)
Purchasing Organization and Design: A Literature Review.
In: BuR - Business Research, 4 (2)
Article

Glock, C. H. ; Grosse, E. H. (2011)
Lagerplatzvergabe in U-förmigen Kommissionierlagern.
In: Zeitschrift für wirtschaftlichen Fabrikbetrieb, 106 (1-2)
Article

Grosse, E. H. ; Glock, C. H. (2011)
Gestaltung von Kommissionierprozessen: der Faktor Mensch.
In: Beschaffung Aktuell, 57 (12)
Article

Glock, C. H. ; Broens, M. (2011)
The organization of purchasing at German universities: an empirical investigation.
In: International Journal of Public Administration, 34 (10)
Article

Glock, C. H. (2011)
A multiple-vendor single-buyer integrated inventory model with a variable number of vendors.
In: Computers & Industrial Engineering, 60
Article

Glock, C. H. (2011)
Batch sizing with controllable production rates in a multi-stage production system.
In: International Journal of Production Research, 49 (20)
Article

Glock, C. H. ; Guiffrida, A. L. ; Jaber, M. Y. (2011)
A mathematical model of alternative forms of supplier development.
Conference or Workshop Item

Glock, C. H. ; Searcy, C. ; Jaber, M. Y. (2011)
Sustainability strategies in an EPQ model with price- and quality-sensitive demand.
Conference or Workshop Item

Glock, C. H. ; Broens, M. (2011)
Organisation des öffentlichen Einkaufs.
In: Kommunaler Beschaffungsdienst, 31 (9)
Article

Glock, C. H. ; Broens, M.
eds.: Glock, C. H. ; Broens, M. (2011)
Prinzipien der Beschaffungsorganisation.
In: Organisation des öffentlichen Einkaufs - Grundlagen, rechtliche Rahmenbedingungen und praktische Fallbeispiele
Book Section

Glock, C. H. ; Broens, M.
eds.: Glock, C. H. ; Broens, M. (2011)
Organisation der Beschaffung in deutschen Kommunen.
In: Organisation des öffentlichen Einkaufs - Grundlagen, rechtliche Rahmenbedingungen und praktische Fallbeispiele. B+G
Book Section

Glock, C. H.
ed.: Jaber, M. Y. (2011)
Learning Effects in Inventory Models with Alternative Shipment Strategies.
In: Learning Curves - Theory, Models, and Applications
Book Section

Glock, C. H. (2010)
Batch sizing with controllable production rates.
In: International Journal of Production Research, 48 (20)
Article

Glock, C. H. ; Jaber, M. Y. (2010)
A study of a two-stage production system with learning and forgetting effects on both stages.
Conference or Workshop Item

Glock, C. H. (2010)
Koordination von Zuliefernetzwerken.
Conference or Workshop Item

Glock, C. H. (2010)
Auswirkungen asymmetrischer Informationsverteilungen in Lieferanten-Abnehmer-Beziehungen.
Conference or Workshop Item

Glock, C. H. ; Broens, M. (2010)
Wissensmanagement in der öffentlichen Verwaltung mithilfe Sozialer Netzwerke - Eine theoriegestützte Analyse.
In: Wissensmanagement, 12 (3)
Article

Glock, C. H. ; Bogaschewsky, R. (2009)
Why Learning Effects May Increase Production Costs.
Conference or Workshop Item

Glock, C. H. (2009)
A Comment: "Integrated single vendor single buyer model with stochastic demand and variable lead time".
In: International Journal of Production Economics, 122 (2)
Article

Glock, C. H. (2009)
Principal-Agent-Problems in a Single-Vendor-Single-Buyer Inventory Model with Quality Considerations.
Conference or Workshop Item

Glock, C. H. ; Bogaschewsky, R. (2009)
An efficiency-based framework for determining organizational cost in purchasing.
Conference or Workshop Item

Glock, C. H. ; Broens, M. ; Bogaschewsky, R. (2009)
Weniger Aufwand bei öffentlichen Auftragsvergaben durch interkommunale Zusammenarbeit.
In: Die Gemeinde - Zeitschrift für die kommunale Selbstverwaltung in Schleswig-Holstein, 61 (5)
Article

Glock, C. H. (2009)
Koordination von Zuliefernetzwerken. Integrierte Losgrößenmodelle zur kostenorientierten Steuerung von Zulieferer-Abnehmer-Beziehungen.
Book

Glock, C. H. ; Broens, M. (2008)
Mehr Effizienz durch Vernetzung des Einkaufs.
In: Führen und Wirtschaften im Krankenhaus, 25 (6)
Article

Glock, C. H. (2008)
Netzwerk für Einkäufer.
In: Kommune21, 8 (11)
Article

Glock, C. H. ; Broens, M. (2008)
Wissensmanagement in der öffentlichen Verwaltung mithilfe von Social-Software-Applikationen.
In: Verwaltung & Management, (14)
Article

Glock, C. H. ; Broens, M. (2008)
Öffentliche Beschaffung: Web 2.0-Anwendungen können Beitrag zur Modernisierung leisten.
In: Innovative Verwaltung, 30 (9)
Article

Glock, C. H. ; Broens, M. (2008)
Potenziale moderner Web 2.0-Anwendungen.
In: Das Krankenhaus, 100 (9)
Article

Glock, C. H. ; Broens, M. (2008)
Web 2.0 und Social Software: Der Beitrag moderner Internet-Anwendungen zu einem Wissensaustausch im öffentlichen Auftragswesen.
In: Kommunaler Beschaffungsdienst, 27 (6)
Article

Glock, C. H. ; Broens, M. (2006)
Teilnahmemöglichkeiten für kleine und mittlere Unternehmen an digitalen Ausschreibungen am Beispiel der Vergabe öffentlicher Aufträge.
In: Wirtschaftswissenschaftliches Studium, 35 (1)
Article

Glock, C. H. ; Broens, M. (2006)
Die elektronische Vergabe.
In: KMUPlus-Magazin, 3 (1)
Article

H

Hatami-Marbini, A. ; Arabmaldar, A. ; Toloo, Mehdi ; Nehrani, A.M. (2022)
Robust non-radial data envelopment analysis models under data uncertainty.
In: Expert Systems with Applications, 207 (118023)
doi: 10.1016/j.eswa.2022.118023
Article

Hatami-Marbini, A. ; Arabmaldar, A. ; Otu Asu, J. (2022)
Robust productivity growth and efficiency measurement with undesirable outputs: evidence from the oil industry.
In: OR Spectrum, 44
doi: 10.1007/s00291-022-00683-y
Article

Hagemann, V. ; Meinecke, J. ; Schaper, M. ; Debbing, C.E. ; Ruiner, C. ; Klumpp, M. ; Hesenius, M. (2021)
Mental Stress and Strain Assessment in Digital Work. The Measurement Instrument MESTAT for Employees and Leaders.
In: Zeitschrift für Arbeits- und Organisationspsychologie, 67 (1)
doi: 10.1026/0932-4089/a000387
Article

Hatami-Marbini, A. ; Arabmaldar, A. (2021)
Robustness of Farrell cost efficiency measurement under data perturbations: Evidence from a US manufacturing application.
In: European Journal of Operational Researc, 295 (2)
doi: 10.1016/j.ejor.2021.03.019
Article

Heydari, J. ; Rastegar, M. ; Glock, C. H. (2017)
A two-level delay in payments contract for supply chain coordination: The case of credit-dependent demand.
In: International Journal of Production Economics, 191
doi: 10.1016/j.ijpe.2017.05.004
Article

Hochrein, S. ; Muther, M. ; Glock, C. H. (2017)
Strategy alignment in purchasing and supply management: a systematic literature review and research framework on the performance impact.
In: International Journal of Integrated Supply Management, 11 (1)
Article

Hariga, M. ; Glock, C. H. ; Kim, T. (2016)
Integrated product and container inventory model for a single-vendor-single-buyer supply chain with owned and rented returnable transport items.
In: International Journal of Production Research, 54 (7)
Article

Hochrein, S. ; Glock, C. H. ; Bogaschewsky, R. ; Heider, M. (2015)
Literature reviews in supply chain management: a tertiary study.
In: Management Review Quarterly, 65 (4)
Article

Hochrein, S. ; Glock, C. H. (2012)
Systematic literature reviews in purchasing and supply management research (angenommen).
In: International Journal of Integrated Supply Management, 7 (4)
Article

J

Jeong, J. ; Glock, C.H. ; Kim, T. (2023)
Ramp-up planning for alternative product portfolios in a multi-product-multi-stage production system.
In: Computers & Industrial Engineering, (182)
doi: 10.1016/j.cie.2023.109390
Article

Jaber, M. Y. ; Peltokorpi, J. ; Glock, C. H. ; Grosse, E. H. ; Pusic, M. (2021)
Adjustment for cognitive interference enhances the predictability of the power learning curve.
In: International Journal of Production Economics, 234 (108045)
doi: 10.1016/j.ijpe.2021.108045
Article

Justus, Nicolas (2018)
Ein Planungssystem für Zulieferer in der Maschinenbaubranche : Entwicklung eines einheitlichen Branchen-Workflows von ETO bis MTS.
Technische Universität Darmstadt
Ph.D. Thesis

Jaber, M. Y. ; Glock, C. H. (2013)
A learning curve for tasks with cognitive and motor elements.
In: Computers & Industrial Engineering, 64 (3)
Article

K

Kim, T. ; Glock, C. H. ; Emde, Simon (2021)
Production planning for a ramp-up process in a multi-stage production system with worker learning and growth in demand.
In: International Journal of Production Research, 2021 (59)
doi: 10.1080/00207543.2020.1798034
Article

Kübler, Patrick ; Glock, C. H. ; Bauernhansl, Thomas (2020)
A new iterative method for solving the joint dynamic storage location assignment, order batching and picker routing problem in manual picker-to-parts warehouses.
In: Computers & Industrial Engineering, 147
doi: 10.1016/j.cie.2020.106645
Article

Kim, T. ; Glock, C. H. (2018)
Production planning for a two-stage production system with multiple parallel machines and variable production rates.
In: International Journal of Production Economics, 196
Article

Kazemi, N. ; Ehsani, E. ; Glock, C. H. ; Schwindl, K. (2015)
A mathematical programming model for a multi-objective supplier selection and order allocation problem with fuzzy objectives.
In: International Journal of Services and Operations Management, 21 (4)
Article

Kim, T. ; Glock, C. H. ; Kwon, Y. (2014)
A closed-loop supply chain for deteriorating products under stochastic container return times.
In: Omega, (43)
Article

Kazemi, N. ; Ehsani, E. ; Glock, C. H. (2014)
Multi-objective supplier selection and order allocation under quantity discounts with fuzzy goals and fuzzy constraints.
In: International Journal of Applied Decision Sciences, 7 (1)
Article

Kim, T. ; Glock, C. H. (2014)
On the use of RFID in the management of reusable containers in closed-loop supply chains under stochastic container return quantities.
In: Transportation Research Part E, 64 (4)
Article

Kim, T. ; Glock, C. H. (2013)
A multi-stage joint economic lot size model with lead time penalty costs.
In: Computers & Industrial Engineering, 66 (1)
Article

Khan, M. ; Jaber, M. Y. ; Glock, C. H. (2012)
Impact of learning on the environmental performance of a two level supply chain.
17th International Symposium on Inventories. Budapest (20.-24. August 2012)
Conference or Workshop Item

Khan, M. ; Jaber, M. Y. ; Glock, C. H. (2011)
A vendor-buyer supply chain with a variable fraction of defectives.
Conference or Workshop Item

L

Lunin, Alexander ; Glock, C. H. (2021)
Systematic review of Kinect-based solutions for physical risk assessment in manual materials handling in industrial and laboratory environments.
In: Computers & Industrial Engineering, 162
doi: 10.1016/j.cie.2021.107660
Article

M

Masae, Makusee ; Vichitkunakorn, Panupong ; Emde, Simon ; Glock, C. H. ; Grosse, E. H. (2021)
Locating charging stations and routing drones for efficient automated stocktaking in warehouses.
25th International Symposium on Logistics (ISL 2021). Online (12.-13.07.2021)
Conference or Workshop Item

Masae, M. ; Glock, C. H. ; Vichitkunakorn, P. (2021)
A method for efficiently routing order pickers in the leaf warehouse.
In: International Journal of Production Economics, Volume 234 (108069)
doi: 10.1016/j.ijpe.2021.108069
Article

Masae, Makusee ; Glock, C. H. ; Vichitkunakorn, Panupong (2020)
Optimal Order Picker Routing in a Conventional Warehouse with Two Blocks and Arbitrary Starting and Ending Points of a Tour.
In: International Journal of Production Research, 58 (17)
doi: 10.1080/00207543.2020.1724342
Article

Masae, M. ; Glock, C. H. ; Grosse, E. H. (2019)
Order picker routing in warehouses: A systematic literature review.
In: International Journal of Production Economics, 224/2020 (107564)
doi: 10.1016/j.ijpe.2019.107564
Article

Masae, Makusee ; Glock, C. H. ; Vichitkunakorn, Panupong (2019)
Optimal order picker routing in the chevron warehouse.
In: IISE Transactions, 2020/52 (6)
doi: 10.1080/24725854.2019.1660833
Article

Masae, Makusee ; Panupong, Vichitkunakorn ; Glock, C. H. (2019)
Optimal routing of order pickers in the leaf warehouse.
24th International Symposium on Logistics (ISL 2019). Wurzburg, Germany (14.-17.07.2019)
Conference or Workshop Item

Meisel, Frank ; Glock, C. H. (2018)
Self-induced learning vs. project-based supplier development for production ramp-up with two supply options.
In: International Journal of Production Economics, 198
doi: 10.1016/j.ijpe.2018.01.029
Article

Marchi, B. ; Ries, J. M. ; Zanoni, S. ; Glock, C. H. (2016)
A joint economic lot size model with financial collaboration and uncertain investment opportunity.
In: International Journal of Production Economics, 176
Article

N

Neumann, W. P. ; Winkelhaus, Sven ; Grosse, E. H. ; Glock, C. H. (2021)
A Systems Framework and Approach for Analysing Human Factors Interactions in Innovation and Industry 4.0 & 5.0.
21st Triennial Congress of the International Ergonomics Association (IEA2021). Vancouver, Canada + Online
Conference or Workshop Item

Neumann, W. Patrick ; Winkelhaus, Sven ; Grosse, Eric H. ; Glock, C. H. (2021)
Industry 4.0 and the human factor – A systems framework and analysis methodology for successful development.
In: International Journal of Production Economics, 2021/233
doi: 10.1016/j.ijpe.2020.107992
Article

P

Perona, Marco ; Zheng, Ting ; Adrodegari, Federico ; Ardolino, Marco ; Bacchetti, Andrea (2021)
An exploratory survey on the impacts of Logistics 4.0 on Italian manufacturing companies.
In: International Journal of Logistics Systems and Management, 1 (1)
doi: 10.1504/IJLSM.2021.10040263
Article

R

Ruiner, C. ; Debbing, C.E. ; Hagemann, V. ; Schaper, M. ; Klumpp, M. ; Hesenius, M. (2022)
Job demands and resources when using technologies at work – development of a digital work typology.
In: Employee Relations, 45 (1)
doi: 10.1108/ER-11-2021-0468
Article

Rad, M. A. ; Khoshalhan, F. ; Glock, C. H. (2018)
Optimal production and distribution policies for a two-stage supply chain with imperfect items and price- and advertisement-sensitive demand: A note.
In: Applied Mathematical Modelling, 57
doi: 10.1016/j.apm.2016.11.003
Article

Ries, Jörg-Martin (2018)
Impact of economic inventory and payment policies on working capital optimization in purchase-to-pay processes.
Technische Universität Darmstadt
Ph.D. Thesis, Primary publication

Ries, J. M. ; Grosse, E. H. ; Fichtinger, J. (2017)
Environmental impact of warehousing: A scenario analysis for the United States.
In: International Journal of Production Research, 55 (21)
Article

Rekik, Y. ; Glock, C. H. ; Syntetos, A. (2017)
Enriching demand forecasts with managerial information to improve inventory replenishment decisions: Exploiting judgment and fostering learning.
In: European Journal of Operational Research, 261
Article

Ries, J. M. ; Glock, C. H. ; Schwindl, K. (2016)
The influence of financial conditions on optimal ordering and payment policies under progressive interest schemes.
In: Omega, 70 (7)
Article

Ries, J. M. ; Glock, C. H. ; Schwindl, K. (2016)
Economic ordering and payment policies under progressive payment schemes and time-value of money.
In: International Journal of Operations and Quantitative Management, 22 (3)
Article

Ries, J. M. ; Grosse, E. H. ; Hochrein, S.
ed.: Mieke, C. (2015)
Lieferanteninnovationen und Unternehmensperformance: Eine Tertiärstudie zur kooperativen Produktentwicklung.
In: Innovations- und Beschaffungsmanagement
Book Section

Rad, M. A. ; Khoshalhan, F. ; Glock, C. H. (2014)
Optimizing inventory and sales decisions in a two-stage supply chain with imperfect quality products and backorders.
In: Computers & Industrial Engineering, 74
Article

Ries, J. M. ; Glock, C. H. (2014)
Evaluating the effect of CPFR investments on risks in supply chains.
18th International Working Seminar on Production Economics. Innsbruck (24.04. - 28.02.2014)
Conference or Workshop Item

Ries, J. M. ; Fichtinger, J. (2014)
Inventory control with environmental criteria and stochastic lead.
20th Conference of the International Federation of Operational Research Societies. Barcelona (13.07. - 18.07.2014)
Conference or Workshop Item

Ries, J. M. ; Glock, C. H. ; Grosse, E. H.
ed.: Mieke, Christian (2014)
Lieferzeitmanagement in Supply Chains - Gestaltungsoptionen und Implikationen.
In: Logistikorientiertes Produktionsmanagement
Book Section

Ries, J. M. ; Glock, C. H. ; Jaber, M. Y. (2013)
Supplier development as an alternative investment in supply chains under financial repression.
Conference or Workshop Item

Ries, J. M. ; Fichtinger, J. ; Arikan, E. (2012)
Impact of transportation lead-time variability on the economical and environmental performance of inventory systems.
17th International Symposium on Inventories. Budapest (20.-24. August 2012)
Conference or Workshop Item

Ries, J. M. (2011)
Optimal delivery policy in two-level supply chains under demand risk.
16th IFPSM Summer School on Advanced Purchasing Research. Salzburg
Conference or Workshop Item

S

Sgarbossa, F. ; Glock, C. H. ; Grosse, E. H. ; Calzavara, M. ; de Koster, René (2022)
The impact of monetary incentives and regulatory focus on worker productivity and learning in order picking.
In: International Journal of Operations & Production Management, 42 (11)
doi: 10.1108/IJOPM-11-2021-0730
Article

Spurk, A. ; Grosse, E. H. ; Schnellbächer, B. ; Glock, C. H. (2022)
Drohnen in der Intralogistik - Chancen und Barrieren.
In: Zeitschrift für Wirtschaftlichen Fabrikbetrieb : ZWF, 117 (7-8)
doi: 10.1515/zwf-2022-1100
Article

Steinebach, Tim ; Wakula, Jurij ; Diefenbach, Heiko ; Glock, Christoph H. ; Grosse, Eric H.
eds.: Goonetilleke, R.S. ; Xiong, S. (2022)
Ergonomic parameters considering physical workload for optimization models in manual order picking.
AHFE International 2022. International Conference - Physical Ergonomics and Human Factors. New York, USA (24-28 July, 2022)
doi: 10.54941/ahfe1002611
Conference or Workshop Item

Setayesh, A. ; Grosse, E. H. ; Glock, C. H. ; Neumann, P. (2022)
Determining the source of human-system errors in manual order picking with respect to human factors.
In: International Journal of Production Research, 60 (20)
doi: 10.1080/00207543.2021.1991022
Article

Schreiber, Markus ; Bausch, Phillip ; Best, Julian ; Metternich, Joachim (2020)
Datenanalyse in Produktionsprozessen. Potenziale und Herausforderungen des Process-Mining-Einsatzes in Theorie und betrieblicher Praxis.
In: ZWF - Zeitschrift für wirtschaftlichen Fabrikbetrieb, 115 (5)
doi: 10.3139/104.112285
Article

Steinebach, Tim ; Grosse, E. H. ; Glock, C. H. ; Wakula, Jurij ; Lunin, Alexander (2020)
Accuracy evaluation of two markerless motion capture systems for measurement of upper extremities: Kinect V2 and Captiv.
In: Human Factors and Ergonomics in Manufacturing & Service Industries, 30 (4)
doi: 10.1002/hfm.20840
Article

Sgarbossa, F. ; Grosse, E. H. ; Neumann, W. P. ; Battini, D. ; Glock, C. H. (2020)
Human factors in production and logistics systems of the future.
In: Annual Reviews in Control, 49
doi: 10.1016/j.arcontrol.2020.04.007
Article

Steinebach, Tim ; Grosse, E. H. ; Glock, C. H. ; Wakula, Jurij ; Lunin, Alexander (2019)
Evaluation der Akkuratheit von markerlosen Motion-Capture-Systemen zur ergonomischen Bewertung von Arbeitsplätzen in der Logistik.
65. GfA-Frühjahrskongress. Dresden (27.02.-01.03.2019)
Conference or Workshop Item

Smunt, T. L. ; Glock, C. H. ; Grosse, E. H. ; Jaber, M. Y. (2017)
Learning and Forgetting Curves: A Systematic Literature Review and Implications for Future Research.
2017 Decision Sciences Institute Annual Conference. Washington DC (November 18-20, 2017)
Conference or Workshop Item

Smunt, T. L. ; Glock, C. H. ; Grosse, E. H. ; Jaber, M. Y. ; Göttmann, S. (2017)
Applications of learning curves in production and operations management: A systematic literature review.
POMS 28th Annual Conference. Seattle, WA (5.-8. Mai 2017)
Conference or Workshop Item

Sgarbossa, F. ; Battini, D. ; Glock, C. H. ; Grosse, E. H. ; Persona, A. (2017)
Ergo-lot-sizing: An approach to integrate ergonomic and economic objectives in manual materials handling.
In: International Journal of Production Economics, 185
Article

Schmidt, Steve ; Glock, C. H. ; Grosse, E. H.
eds.: Glock, C. H. ; Grosse, E. H. (2017)
Indoor-Positioning Systeme in der Lagerverwaltung.
In: Warehousing 4.0 - Technische Lösungen und Managementkonzepte für die Lagerlogistik der Zukunft
Book Section

Schneider, Maximilian ; Biel, K. ; Pfaller, S. ; Schaede, Hendrik ; Rinderknecht, Stephan ; Glock, C. H. (2016)
Using inventory models for sizing energy storage systems: An interdisciplinary approach.
In: Journal of Energy Storage, 8
Article

Schneider, Maximilian ; Biel, K. ; Pfaller, S. ; Schaede, Hendrik ; Rinderknecht, Stephan ; Glock, C. H. (2015)
Optimal Sizing of Electrical Energy Storage Systems using Inventory Models.
In: Energy Procedia, 73 (June 2015)
Article

Shekarian, E. ; Glock, C. H. ; Pourmousavi, S. M. ; Schwindl, K. (2014)
Optimal manufacturing lot size for a single-stage production system with rework in a fuzzy environment.
In: Journal of Intelligent and Fuzzy Systems, 27 (6)
Article

T

Tahirov, N. ; Glock, C.H. (2022)
Manufacturer encroachment and channel conflicts: A systematic review of the literature.
In: European Journal of Operational Research, 302 (2)
doi: 10.1016/j.ejor.2021.12.006
Article

Tavana, M. ; Toloo, M. ; Aghayi, N. ; Arabmaldar, A. (2021)
A robust cross-efficiency data envelopment analysis model with undesirable outputs.
In: Expert Systems with Applications, 167 (114117)
doi: 10.1016/j.eswa.2020.114117
Article

Tadumadze, Giorgi ; Emde, Simon ; Diefenbach, Heiko (2020)
Exact and heuristic algorithms for scheduling jobs with time windows on unrelated parallel machines.
In: OR Spectrum, 42 (2)
doi: 10.1007/s00291-020-00586-w
Article

Teßmann, R. ; Grosse, E. H. ; Glock, C. H. (2017)
Das Lager vernetzt sich.
In: handling : Hoppenstedt Publishing, Darmstadt, (10)
Article

Teßmann, R. ; Glock, C. H. ; Grosse, E. H. (2017)
Die Lagerlogistik macht sich fit für die Zukunft.
In: MM MaschinenMarkt, 123 (28)
Article

Teßmann, R. ; Glock, C. H. ; Grosse, E. H.
eds.: Glock, C. H. ; Grosse, E. H. (2017)
Intelligente Ladungsträger - Funktionsweise und Nutzen für die Lagerlogistik.
In: Warehousing 4.0 - Technische Lösungen und Managementkonzepte für die Lagerlogistik der Zukunft
Book Section

W

Winkelhaus, S. ; Glock, C.H. ; Grosse, E.H. (2022)
Einfluss der Digitalisierung auf die Arbeitszufriedenheit in Produktion und Logistik.
In: Industrie 4.0 Management, 4 (38)
Article

Winkelhaus, Sven ; Zhang, Minqi ; Grosse, E. H. ; Glock, C. H. (2022)
Hybrid order picking: A simulation model of a joint manual and autonomous order picking system.
In: Computers & Industrial Engineering, 167 (107981)
doi: 10.1016/j.cie.2022.107981
Article

Winkelhaus, S. ; Grosse, E. H. ; Glock, C. H. (2022)
Job satisfaction: An explorative study on work characteristics changes of employees in Intralogistics 4.0.
In: Journal of Business Logistics, 43 (3)
doi: 10.1111/jbl.12296
Article

Winkelhaus, S. ; Grosse, E. H. ; Neumann, W. P. ; Glock, C. H. (2020)
Industry 4.0 and the Human Factor – A Systems Framework for Successful Development.
21. International Working Seminar on Production Economics. (24.02.2020 - 28.02.2020)
Conference or Workshop Item

Winkelhaus, S. ; Grosse, E. H. (2020)
Logistics 4.0: a systematic review towards a new logistics system.
In: International Journal of Production Research, 58 (1)
doi: 10.1080/00207543.2019.1612964
Article

Winkelhaus, S. ; Grosse, E. H. (2019)
Logistik 4.0 – Paradigmenwandel als Chance für Menschen und Unternehmen.
In: ZWF Zeitschrift für wirtschaftlichen Fabrikbetrieb, 114 (10)
doi: 10.3139/104.112157
Article

Winkelhaus, S. ; Grosse, E. H. (2019)
On the Way to Logistics 4.0 - a Systematic Review and Outlook.
9th IFAC Conference on Manufacturing Modelling, Management and Control (MIM 2019). (28.-30. August 2019)
Conference or Workshop Item

Weitzel, Timm ; Glock, C. H. (2019)
Scheduling a Storage-Augmented Discrete Production Facility under Incentive-based Demand Response.
In: International Journal of Production Research, 57 (1)
Article

Weitzel, Timm (2018)
Operating Storage-Augmented Energy Systems in Industrial and Residential Applications.
Technische Universität Darmstadt
Ph.D. Thesis, Primary publication

Winkelhaus, S. ; Sgarbossa, F. ; Calzavara, M. ; Grosse, E. H. (2018)
The effects of human fatigue on learning in order picking - an explorative experimental investigation.
In: IFAC PapersOnLine, 51 (11)
Article

Weitzel, Timm ; Glock, C. H. (2018)
Energy Management for Stationary Electric Energy Storage Systems: A Systematic Literature Review.
In: European Journal of Operational Research, 2 (264)
doi: 10.1016/j.ejor.2017.06.052
Article

Weitzel, Timm ; Schneider, Maximilian ; Glock, C. H. ; Löber, Florian ; Rinderknecht, Stephan (2018)
Operating a Storage-Augmented Hybrid Microgrid Considering Battery Aging Costs.
In: Journal of Cleaner Production, 188
doi: 10.1016/j.jclepro.2018.03.296
Article

Winkelhaus, S. ; Sgarbossa, F. ; Calzavara, M. ; Grosse, E. H. (2018)
The effects of human fatigue on learning in order picking: an explorative experimental investigation.
16th IFAC Symposium on Information Control Problems in Manufacturing. Bergamo, Italien (11. - 13. Juni 2018)
Conference or Workshop Item

Weitzel, Timm ; Schneider, Maximilian ; Glock, C. H. ; Rinderknecht, Stephan (2017)
A Stochastic Optimization Model for Energy Management of Storage-Augmented Hybrid Multi-Building Districts Considering Battery Aging Costs.
OR2017 - International Conference on Operations Research. Berlin, Deutschland (6.-8.09.2017)
Conference or Workshop Item

Z

Zhang, Minqi ; Grosse, Eric H. ; Glock, Christoph H. (2023)
Ergonomic and economic evaluation of a collaborative hybrid order picking system.
In: International Journal of Production Economics, 258
doi: 10.1016/j.ijpe.2023.108774
Article

Zhang, Yunrong ; Glock, Christoph H. ; Chen, Zhixiang (2023)
Estimating the participation value of electricity demand-response programmes for a two-stage production system.
In: International Journal of Production Research, 60 (21)
doi: 10.1080/00207543.2021.1992681
Article

Zheng, Ting ; Glock, C. H. ; Grosse, E. H. (2022)
Opportunities for using eye tracking technology in manufacturing and logistics: Systematic literature review and research agenda.
In: Computers & Industrial Engineering, 171 (108444)
doi: 10.1016/j.cie.2022.108444
Article

Zheng, Ting ; Grosse, Eric H. ; Glock, Christoph H. (2022)
Exploring the potentials of using Eye Tracking in logistics: a systematic literature review and concept.
26th International Symposium on Logistics. Cork, Ireland (10-13th July 2022)
Conference or Workshop Item

Zhang, Minqi ; Grosse, Eric H. ; Glock, Christoph H (2022)
Potential of mobile applications in human-centric production and logistics management.
10th IFAC Conference on Manufacturing Modelling, Management and Control (MIM 2022). Nantes, France (22-24 June 2022)
doi: 10.1016/j.ifacol.2022.09.382
Conference or Workshop Item

Zheng, T. ; Füchtenhans, M. ; Glock, C. H. ; Grosse, E. H. (2022)
Eye Tracking – Nutzen für Produktion und Logistik.
In: Factory Innovation, 2 (4)
Article

Zhang, Minqi ; Winkelhaus, Sven ; Grosse, E. H. ; Glock, C. H. (2021)
A simulation model for evaluating the efficiency of robot-supported order picking warehouses.
25th International Symposium on Logistics (ISL 2021). Online (12.-13.07.2021)
Conference or Workshop Item

Zhang, Minqi ; Semar, T ; Grosse, E. H. ; Winkelhaus, Sven ; Glock, C. H. (2021)
Mensch-Roboter-Kollaboration in der Kommissionierung.
In: Zeitschrift für Wirtschaftlichen Fabrikbetrieb : ZWF, 116 (6)
doi: 10.1515/zwf-2021-0107
Article

Zheng, Ting ; Ardolino, Marco ; Bacchetti, Andrea ; Perona, Marco (2021)
The applications of Industry 4.0 technologies in manufacturing context: a systematic literature review.
In: International Journal of Production Research, 59 (6)
doi: 10.1080/00207543.2020.1824085
Article

Zhang, Y ; Hong, Z ; Chen, Z ; Glock, C. H. (2020)
Tax or subsidy? Design and selection of regulatory policies for remanufacturing.
In: European Journal of Operational Research, 287 (3)
doi: 10.1016/j.ejor.2020.05.023
Article

Zheng, Ting ; Ardolino, Marco ; Bacchetti, Andrea ; Perona, Marco ; Zanardini, Massimo (2020)
The impacts of Industry 4.0: a descriptive survey in the Italian manufacturing sector.
In: Journal of Manufacturing Technology Management, (5)
doi: 10.1108/JMTM-08-2018-0269
Article

Zheng, Ting ; Ardolino, M. ; Bacchetti, A. ; Perona, M. (2019)
Enabling technologies, impacts and challenges of “industry 4.0” in the manufacturing context: Some insights from a preliminary literature review.
24th Summer School Francesco Turco, 2019. Brescia, Italy (11.-13.09.2019)
Conference or Workshop Item

Zheng, Ting ; Ardolino, M. ; Bacchetti, A. ; Perona, M. (2018)
Industry 4.0 revolution: State-of-the-art of the Italian manufacturing context.
23rd Summer School "Francesco Turco" - Industrial Systems Engineering 2018. Palermo, Italy (12.-14.09.2018)
Conference or Workshop Item

Zulj, I. ; Glock, C. H. ; Grosse, E. H. ; Schneider, Michael (2018)
Picker routing and storage-assignment strategies for precedence-constrained order picking.
In: Computers & Industrial Engineering, 123
Article

Zhai, Y. ; Biel, K. ; Zhao, F. ; Sutherland, J. W. (2017)
Dynamic scheduling of a flow shop with on-site wind generation for energy cost reduction under real time electricity pricing.
In: CIRP Annals - Manufacturing Technology, 66 (1)
Article

Zanoni, S. ; Bettoni, L. ; Glock, C. H. (2014)
Energy Implications in a Two-Stage Production System with Controllable Production Rates.
In: International Journal of Production Economics, 149
Article

Zanoni, S. ; Glock, C. H. ; Marchi, B. ; Ries, J. M. ; Jaber, M. Y. (2014)
A joint economic lot size model with financial credits and uncertain investment opportunities.
18th International Working Seminar on Production Economics. Innsbruck (24.02. - 28.02.2014)
Conference or Workshop Item

Zanoni, S. ; Bettoni, L. ; Glock, C. H. (2012)
Energy implications in batch sizing with controllable production rates in a two-stage production system.
Innsbruck
Conference or Workshop Item

This list was generated on Thu Dec 7 01:00:22 2023 CET.