TU Darmstadt / ULB / TUbiblio

Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space.

Emde, Simon and Abedinnia, Hamid and Lange, Anne and Glock, C. H. (2020):
Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space.
In: OR Spectrum, 42, pp. 397-426. ISSN 0171-6468,
[Article]

Item Type: Article
Erschienen: 2020
Creators: Emde, Simon and Abedinnia, Hamid and Lange, Anne and Glock, C. H.
Title: Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space.
Language: English
Journal or Publication Title: OR Spectrum
Journal volume: 42
Divisions: 01 Department of Law and Economics
01 Department of Law and Economics > Betriebswirtschaftliche Fachgebiete
01 Department of Law and Economics > Betriebswirtschaftliche Fachgebiete > Fachgebiet Produktion und Supply Chain Management
01 Department of Law and Economics > Betriebswirtschaftliche Fachgebiete > Operations Research
01 Department of Law and Economics > Betriebswirtschaftliche Fachgebiete > Fachgebiet Industrielles Management
01 Department of Law and Economics > Betriebswirtschaftliche Fachgebiete > Fachgebiet Multimodalität und Logistiktechnologien
Date Deposited: 22 Apr 2020 13:03
Official URL: https://link.springer.com/article/10.1007/s00291-020-00580-2
Export:
Suche nach Titel in: TUfind oder in Google
Send an inquiry Send an inquiry

Options (only for editors)
Show editorial Details Show editorial Details