Clare, J. ; Gwildis, U. ; Cochran, J. ; Mageau, D. ; Hauser, G. (2012)
What to do when a TBM is stopped 320 feet deep below a residential neighborhood and 10,000 feet from the nearest shaft? - Brightwater Conveyance System Final Design Project, King County, Washington.
ASCE Seattle Section Geotechnical Group Dinner Lecture. Seattle (25.10.2012-25.10.2012)
Konferenzveröffentlichung, Bibliographie
Gwildis, U. ; Cochran, J. ; Clare, J. ; Mageau, D. ; Hauser, G. (2012)
Use of Ground Freezing for Connecting two Tunnel Boring Machine-Driven Tunnels 300 Feet Underground.
North American Tunneling (NAT) Conference 2012. Indianapolis (24.06.2012-27.06.2012)
Konferenzveröffentlichung, Bibliographie