TU Darmstadt / ULB / TUbiblio

Browse by Person

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: No Grouping | Item Type | Date | Language
Number of items: 2.

Clare, J. and Gwildis, U. and Cochran, J. and Mageau, D. and Hauser, G. (2012):
What to do when a TBM is stopped 320 feet deep below a residential neighborhood and 10,000 feet from the nearest shaft? - Brightwater Conveyance System Final Design Project, King County, Washington.
In: ASCE Seattle Section Geotechnical Group Dinner Lecture, Seattle, 25.10.2012, [Conference or Workshop Item]

Gwildis, U. and Cochran, J. and Clare, J. and Mageau, D. and Hauser, G. (2012):
Use of Ground Freezing for Connecting two Tunnel Boring Machine-Driven Tunnels 300 Feet Underground.
In: North American Tunneling (NAT) Conference 2012, Indianapolis, 24.-27.06.2012, [Conference or Workshop Item]

This list was generated on Tue Jun 25 01:05:37 2019 CEST.