TU Darmstadt / ULB / TUbiblio

Browse by Person

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: No Grouping | Item Type | Date | Language
Number of items: 25.

Gwildis, U. and Sass, I. (2018):
Tool wear analysis of pressurized face TBM drives in the glacial geology of the Pacific Northwest.
In: Geomechanics and Tunnelling, pp. 150-156, 11, (2), [Online-Edition: https://doi.org/10.1002/geot.201800002],
[Article]

Gwildis, U. and Jafari, M. and Hall, M. and Kelly, T. (2016):
The Musaimeer Outfall Tunnel – Venturing into Uncharted Territory of Sub-Sea Sabkha Deposits.
In: ITA-AITES World Tunnel Congress 2016, San Francisco, 22.-28.02.2016, [Conference or Workshop Item]

Gwildis, U. and Lach, M. and Newby, J. (2014):
Construction Risk Management for Conveyance Infrastructure.
In: Pacific Northwest Clean Water Association (PNCWA) Annual Conference, Vancouver, 26.-29.10.2014, [Conference or Workshop Item]

Gwildis, U. and Robinson, R. and Sage, R. and Sowers, D. (2014):
Advancements in Geotechnical Planning for TBM Projects in Glacial Geology.
In: North American Tunneling Conference (NAT) 2014, Los Angeles, 22.-25.06.2014, [Conference or Workshop Item]

Gwildis, U. (2013):
Ground Freezing – Fundamentals and Case Studies.
In: Oregon Section Geotechnical Group Dinner Lecture, Lake Oswego, 02.10.2013, [Conference or Workshop Item]

Gwildis, U. and Newby, J. and Cochran, J. and Maday, L. (2013):
Considerations for Mechanized Tunneling in Glacial Geology.
In: Association of Environmental & Engineering Geologists (AEG) 56th Annual Meeting, Seattle, 08.-15.09.2013, [Conference or Workshop Item]

Newby, J. and Gwildis, U. and Crippen, J. (2012):
Trenchless Rehabilitation of Aging Water and Sewer Infrastructure.
In: APWA Washington Chapter Fall Conference, Spokane, 10.-11.10.2012, [Conference or Workshop Item]

Clare, J. and Gwildis, U. and Cochran, J. and Mageau, D. and Hauser, G. (2012):
What to do when a TBM is stopped 320 feet deep below a residential neighborhood and 10,000 feet from the nearest shaft? - Brightwater Conveyance System Final Design Project, King County, Washington.
In: ASCE Seattle Section Geotechnical Group Dinner Lecture, Seattle, 25.10.2012, [Conference or Workshop Item]

Hauser, G. and Cochran, J. and Cole, M. and Gwildis, U. and Trisi, W. and Olsen, G. and Shinouda, M. (2012):
Brightwater BT-3 Tunnel Completion: Extending the BT-4 Earth Pressure Balance Drive in Complex Glacial Geology.
In: North American Tunneling (NAT) Conference 2012, Indianapolis, 24.-27.06.2012, [Conference or Workshop Item]

Gwildis, U. and Cochran, J. and Clare, J. and Mageau, D. and Hauser, G. (2012):
Use of Ground Freezing for Connecting two Tunnel Boring Machine-Driven Tunnels 300 Feet Underground.
In: North American Tunneling (NAT) Conference 2012, Indianapolis, 24.-27.06.2012, [Conference or Workshop Item]

Gwildis, U. and Lach, M. and Sariosseiri, F. (2012):
Deep Portal Shafts for the Brightwater Tunnels: Geotechnical Design Considerations and Construction Experience.
In: GeoCongress 2012, Oakland, 25.-29.03.2012, [Conference or Workshop Item]

Shinouda, M. and Gwildis, U. and Wang, P. and Hodder, W. (2011):
Cutterhead Maintenance for EPB Tunnel Boring Machines.
In: Rapid Excavation and Tunneling Conference (RETC) 2011, San Francisco, 19.-22.06.2011, [Conference or Workshop Item]

Newby, J. and Gwildis, U. (2011):
Geotechnical Aspects of the Brightwater Tunnels, Microtunnels, and Portal Structures.
In: ASCE Seattle Section Geotechnical Group 28th Annual Spring Seminar ‘Soft Ground Tunneling in Urban Environments’, Seattle, 30.04.2011, [Conference or Workshop Item]

Gwildis, U. (2011):
Microtunneling in Glacial Deposits – The Brightwater Swamp Creek Connector Project as Case Study.
In: NASTT Pacific Northwest Trenchless Symposium, SeaTac, 25.02.2011, [Conference or Workshop Item]

Gwildis, U. and Sass, I. and Gilbert, M. B.
Tiedemann, J. (ed.) (2011):
Einfluss von Bodenabrasivität beim Maschinellen Tunnelvortrieb.
In: 18. Tagung für Ingenieurgeologie und Forum für junge Ingenieurgeologen, Berlin, Universitätsverlag der Technischen Universität Berlin, In: 18. Tagung für Ingenieurgeologie und Forum für junge Ingenieurgeologen, Berlin, 16.-19.03.2011, [Conference or Workshop Item]

Gwildis, U. and Sass, I. and Rostami, J. and Gilbert, M. B. (2010):
Soil Abrasion Effects on TBM Tunneling.
In: ITA-AITES World Tunnel Congress 2010, Vancouver, 14.-20.05.2010, [Conference or Workshop Item]

Gwildis, U. and Maday, L. and Newby, J. (2009):
Actual vs. Baseline Tracking During TBM Tunneling in Highly Variable Glacial Geology.
In: Rapid Excavation and Tunneling Conference (RETC) 2009 in Las Vegas, 14.-17.06.2009, Conference Proceedings, Las Vegas, pp. 250-262, [Book Section]

Gwildis, U. and Hass, H. (2009):
Ground Freezing – Fundamentals and Recent Applications in Europe and the Pacific Northwest.
In: ASCE Seattle Section Geotechnical Group Dinner Lecture, Bellevue, 26.03.2009, [Conference or Workshop Item]

Gwildis, U. and Sass, I. (2008):
Maschineller Tunnelbau in wechselhafter glazialer Geologie – ein Ansatz probabilistischer Baugrundbeschreibung und baubegleitender Überpruefung.
In: Geotechnik, VGE Verlag, pp. 301-307, 31, (4), [Article]

Gwildis, U. and Gilbert, M. (2007):
Comparison of Risk Management Strategies for Tunneling.
In: North American Society for Trenchless Technology (NASTT) 2007 No-Dig Conference, San Diego, 16.-19.04.2007, [Conference or Workshop Item]

Burbaum, U. and Krajewski, W. and Gwildis, U. and Ebbinghaus, E. (2004):
Stollen- und Tunnelvortrieb in Heilquellenschutzgebieten des Rhein-Main-Gebietes, Vortriebskonzepte und Risikominimierung.
In: Technische Akademie Esslingen, 4. Kolloquium Bauen in Boden und Fels, Ostfildern, 20.-21.01.2004, [Conference or Workshop Item]

Gwildis, U. and Holzmann, B. and Seis, B. (2003):
Rohrvortrieb im Heilquellenschutzgebiet.
In: Tis – Tiefbau Ingenieurbau Strassenbau, BertelsmannSpringer Bauverlag, pp. 14-18, (1-2), [Article]

Bohlen, D. and Gwildis, U. and Recknagel, J. (2002):
Sanierung des Pionierpark-Gelaendes in Muehlheim – Ein Beispiel fuer Flächenrecycling in Hessen.
In: Franzius/Wolf/Brandt: HdA – Handbuch der Altlastensanierung, 31. Lfg., Heidelberg, C.F. Mueller Verlag, [Book Section]

Gwildis, U. and Bohlen, D. (2002):
Systemsicherheit bei der Altlastensanierung durch Schadstoffimmobilisierung am Fallbeispiel Pionierpark Muehlheim.
In: Mitteilungen zur Ingenieurgeologie und Hydrogeologie, herausgegeben vom Lehrstuhl für Ingenieurgeologie und Hydrogeologie der RWTH Aachen, Heft 80 (Festschrift zu Ehren von Kurt Schetelig), Aachen, pp. 137-156, [Book Section]

Sass, I. and Gwildis, U. and Donié, C. (2002):
Microtunnelung im Heilquellenschutzgebiet — Geotechnische und geophysikalische Erkundung.
In: Vorträge der Baugrundtagung 2002, Essen, VGE, In: Baugrundtagung, Mainz, 26.-27.09.2002, [Conference or Workshop Item]

This list was generated on Tue Jun 18 02:13:45 2019 CEST.