Reliability Model of Large Offshore Wind Farms

Spahic, Ervin ; Underbrink, Andreas ; Buchert, Vincent ; Hanson, Jutta ; Jeromin, Ingo ; Balzer, Gerd (2009)
Reliability Model of Large Offshore Wind Farms.
2009 IEEE Bucharest PowerTech. Bucharest, Romania (28.06.-02.07.2009)
doi: 10.1109/PTC.2009.5281878
Konferenzveröffentlichung, Bibliographie

Kurzbeschreibung (Abstract)

For investors of wind farms projects, it is indispensable to get reliable prognosis of the expected energy produced per year, taking into account technical failures and the stochastic characteristic of the wind. This applies especially for offshore wind farms with higher installation costs and difficult maintenance conditions. The repair of components located on sea may take many days or even weeks because of limited access caused by bad weather conditions. Additionally, transmission system operators which are providing the point of common coupling (PCC) have to know the impact of the wind farm on the reliability of the grid. In this paper a model for the probabilistic reliability calculation of the offshore wind farms as a whole and as a part of the entire system has been introduced.

Typ des Eintrags: Konferenzveröffentlichung
Erschienen: 2009
Autor(en): Spahic, Ervin ; Underbrink, Andreas ; Buchert, Vincent ; Hanson, Jutta ; Jeromin, Ingo ; Balzer, Gerd
Art des Eintrags: Bibliographie
Titel: Reliability Model of Large Offshore Wind Farms
Sprache: Englisch
Publikationsjahr: 9 Oktober 2009
Verlag: IEEE
Buchtitel: 2009 IEEE Bucharest PowerTech
Veranstaltungstitel: 2009 IEEE Bucharest PowerTech
Veranstaltungsort: Bucharest, Romania
Veranstaltungsdatum: 28.06.-02.07.2009
DOI: 10.1109/PTC.2009.5281878
URL / URN: https://ewh.ieee.org/conf/powertech/2009/
Kurzbeschreibung (Abstract):

For investors of wind farms projects, it is indispensable to get reliable prognosis of the expected energy produced per year, taking into account technical failures and the stochastic characteristic of the wind. This applies especially for offshore wind farms with higher installation costs and difficult maintenance conditions. The repair of components located on sea may take many days or even weeks because of limited access caused by bad weather conditions. Additionally, transmission system operators which are providing the point of common coupling (PCC) have to know the impact of the wind farm on the reliability of the grid. In this paper a model for the probabilistic reliability calculation of the offshore wind farms as a whole and as a part of the entire system has been introduced.

Fachbereich(e)/-gebiet(e): 18 Fachbereich Elektrotechnik und Informationstechnik
18 Fachbereich Elektrotechnik und Informationstechnik > Institut für Elektrische Energiesysteme > Elektrische Energieversorgung unter Einsatz Erneuerbarer Energien
18 Fachbereich Elektrotechnik und Informationstechnik > Institut für Elektrische Energiesysteme
Hinterlegungsdatum: 26 Okt 2023 09:05
Letzte Änderung: 26 Okt 2023 09:05
PPN:
Export:
Suche nach Titel in: TUfind oder in Google
Frage zum Eintrag Frage zum Eintrag

Optionen (nur für Redakteure)
Redaktionelle Details anzeigen Redaktionelle Details anzeigen