Santos, Allan ; Steinke, Florian (2023)
Robust Placement and Control of Phase-Shifting Transformers Considering Redispatch Measures.
In: Energies, 16 (11)
doi: 10.3390/en16114438
Artikel, Bibliographie
Kurzbeschreibung (Abstract)
Flexible AC transmission systems (FACTSs) can maximize capacity utilization under time-varying grid usage patterns by actively controlling the power flow of the transmission lines, e.g., with phase-shifting transformers (PST). In this paper, we propose an algorithm to determine the minimum number of PSTs and their location such that the grid can operate robustly for any realization of the (active) power set points from a known, continuous uncertainty set. As we show in our experiments, only considering a few extreme grid scenarios cannot provide this guarantee. The proposed algorithm considers the trade-offs between PST placement and operational decisions, such as PST control and redispatch. By minimizing the worst-case redispatch cost, it yields two affine linear control policies for these as a byproduct. Power flow is modeled as a constrained linear system, and the control design and actuator minimization tasks are formulated as a mixed-integer linear program (MILP). We also design a greedy algorithm, whose optimal value differs less than 20% from the MILP solution while being one to two orders of magnitude faster to compute. The proposed algorithm is evaluated for a small demonstrative 3-bus example and the IEEE 39 bus test system.
Typ des Eintrags: | Artikel |
---|---|
Erschienen: | 2023 |
Autor(en): | Santos, Allan ; Steinke, Florian |
Art des Eintrags: | Bibliographie |
Titel: | Robust Placement and Control of Phase-Shifting Transformers Considering Redispatch Measures |
Sprache: | Englisch |
Publikationsjahr: | 31 Mai 2023 |
Verlag: | MDPI |
Titel der Zeitschrift, Zeitung oder Schriftenreihe: | Energies |
Jahrgang/Volume einer Zeitschrift: | 16 |
(Heft-)Nummer: | 11 |
DOI: | 10.3390/en16114438 |
Kurzbeschreibung (Abstract): | Flexible AC transmission systems (FACTSs) can maximize capacity utilization under time-varying grid usage patterns by actively controlling the power flow of the transmission lines, e.g., with phase-shifting transformers (PST). In this paper, we propose an algorithm to determine the minimum number of PSTs and their location such that the grid can operate robustly for any realization of the (active) power set points from a known, continuous uncertainty set. As we show in our experiments, only considering a few extreme grid scenarios cannot provide this guarantee. The proposed algorithm considers the trade-offs between PST placement and operational decisions, such as PST control and redispatch. By minimizing the worst-case redispatch cost, it yields two affine linear control policies for these as a byproduct. Power flow is modeled as a constrained linear system, and the control design and actuator minimization tasks are formulated as a mixed-integer linear program (MILP). We also design a greedy algorithm, whose optimal value differs less than 20% from the MILP solution while being one to two orders of magnitude faster to compute. The proposed algorithm is evaluated for a small demonstrative 3-bus example and the IEEE 39 bus test system. |
Freie Schlagworte: | emergenCITY, emergenCITY_CPS |
Fachbereich(e)/-gebiet(e): | 18 Fachbereich Elektrotechnik und Informationstechnik 18 Fachbereich Elektrotechnik und Informationstechnik > Institut für Datentechnik > Energieinformationsnetze und Systeme (EINS) 18 Fachbereich Elektrotechnik und Informationstechnik > Institut für Datentechnik LOEWE LOEWE > LOEWE-Zentren LOEWE > LOEWE-Zentren > emergenCITY Forschungsfelder Forschungsfelder > Energy and Environment Forschungsfelder > Energy and Environment > Integrated Energy Systems |
Hinterlegungsdatum: | 28 Jul 2023 08:16 |
Letzte Änderung: | 31 Jul 2023 07:06 |
PPN: | 510027970 |
Export: | |
Suche nach Titel in: | TUfind oder in Google |
Frage zum Eintrag |
Optionen (nur für Redakteure)