Perez, F. ; Ocampo, J. ; Salom, A. ; Solans, P. ; Ebert, M. ; Onken, R. ; Hülsmann, P. ; Müller, W. F. O. (2022)
3HC - Third Harmonic normal Conducting active Cavity Collaboration between HZB, Desy and Alba.
13th International Particle Accelerator Conference. Bangkok, Thailand (12.06.2022-17.06.2022)
doi: 10.18429/JACoW-IPAC2022-TUPOMS028
Konferenzveröffentlichung, Bibliographie
Kurzbeschreibung (Abstract)
A collaboration agreement between the HZB, DESY and ALBA institutions was signed on 2021 in order to test the 3rd harmonic normal conducting, HOM damped, active cavity designed and prototyped by ALBA [1]. The test will involve low power characterization of the fundamental mode, bead pull measurements to fully determine the HOM characteristics, a full high power conditioning to validate the power capability of the cavity, and finally, the installa- tion of the cavity in the BESSY II storage ring in order to test the cavity in real conditions with beam. In this paper the low power, bead pull and conditioning results will be presented. The cavity has been installed at BESSY II on May 2022 to be tested after the summer shutdown.
Typ des Eintrags: | Konferenzveröffentlichung |
---|---|
Erschienen: | 2022 |
Autor(en): | Perez, F. ; Ocampo, J. ; Salom, A. ; Solans, P. ; Ebert, M. ; Onken, R. ; Hülsmann, P. ; Müller, W. F. O. |
Art des Eintrags: | Bibliographie |
Titel: | 3HC - Third Harmonic normal Conducting active Cavity Collaboration between HZB, Desy and Alba |
Sprache: | Englisch |
Publikationsjahr: | Juli 2022 |
Ort: | Geneva |
Verlag: | JACoW |
Buchtitel: | Proceedings of the 13th International Particle Accelerator Conference |
Veranstaltungstitel: | 13th International Particle Accelerator Conference |
Veranstaltungsort: | Bangkok, Thailand |
Veranstaltungsdatum: | 12.06.2022-17.06.2022 |
DOI: | 10.18429/JACoW-IPAC2022-TUPOMS028 |
URL / URN: | https://accelconf.web.cern.ch//ipac2022/ |
Kurzbeschreibung (Abstract): | A collaboration agreement between the HZB, DESY and ALBA institutions was signed on 2021 in order to test the 3rd harmonic normal conducting, HOM damped, active cavity designed and prototyped by ALBA [1]. The test will involve low power characterization of the fundamental mode, bead pull measurements to fully determine the HOM characteristics, a full high power conditioning to validate the power capability of the cavity, and finally, the installa- tion of the cavity in the BESSY II storage ring in order to test the cavity in real conditions with beam. In this paper the low power, bead pull and conditioning results will be presented. The cavity has been installed at BESSY II on May 2022 to be tested after the summer shutdown. |
Fachbereich(e)/-gebiet(e): | 18 Fachbereich Elektrotechnik und Informationstechnik 18 Fachbereich Elektrotechnik und Informationstechnik > Institut für Theorie Elektromagnetischer Felder (ab 01.01.2019 umbenannt in Institut für Teilchenbeschleunigung und Theorie Elektromagnetische Felder) 18 Fachbereich Elektrotechnik und Informationstechnik > Institut für Teilchenbeschleunigung und Theorie Elektromagnetische Felder > Theorie Elektromagnetischer Felder 18 Fachbereich Elektrotechnik und Informationstechnik > Institut für Teilchenbeschleunigung und Theorie Elektromagnetische Felder |
Hinterlegungsdatum: | 31 Okt 2022 13:11 |
Letzte Änderung: | 09 Mai 2023 14:26 |
PPN: | 507633164 |
Export: | |
Suche nach Titel in: | TUfind oder in Google |
Frage zum Eintrag |
Optionen (nur für Redakteure)
Redaktionelle Details anzeigen |