TU Darmstadt / ULB / TUbiblio

Assessment of the operability of a 20 MWth calcium looping demonstration plant by advanced process modelling

Haaf, Martin ; Hilz, Jochen ; Helbig, Martin ; Weingärtner, Christoph ; Stallmann, Olaf ; Ströhle, Jochen ; Epple, Bernd (2018)
Assessment of the operability of a 20 MWth calcium looping demonstration plant by advanced process modelling.
In: International Journal of Greenhouse Gas Control, 75
doi: 10.1016/j.ijggc.2018.05.014
Article, Bibliographie

Abstract

The Calcium Looping (CaL) process is a promising technology for post-combustion CO2 capture from fossil-fired power plants and carbon intense industry. Within a CaL system, a limestone based sorbent stream is forced to circulation between two interconnected circulating fluidized bed (CFB) reactors. The main part of the CO2, contained in the flue gas stream is absorbed by CaO within the carbonator, whereas it is released during regeneration in the oxy-fired calciner. The feasibility of this technology was proven by numerous experimental investigations in semi-industrial scale. The next step in the development of this technology is expected to be a demonstration plant in the scale of approximately 20 MWth. The focus of this paper is the determination of the heat and mass balances and the assessment of the operability of a newly designed 20 MWth CaL demonstration plant. The investigations are based on a steady-state process model, which has been validated by experimental data from 1 MWth pilot tests. The aspect of solid entrainment during part load operation are addressed. In the present design case, a stable operation of the demonstration plant at 40 % equivalent carbonator load is feasible without additional flue gas recirculation.

Item Type: Article
Erschienen: 2018
Creators: Haaf, Martin ; Hilz, Jochen ; Helbig, Martin ; Weingärtner, Christoph ; Stallmann, Olaf ; Ströhle, Jochen ; Epple, Bernd
Type of entry: Bibliographie
Title: Assessment of the operability of a 20 MWth calcium looping demonstration plant by advanced process modelling
Language: English
Date: August 2018
Journal or Publication Title: International Journal of Greenhouse Gas Control
Volume of the journal: 75
DOI: 10.1016/j.ijggc.2018.05.014
URL / URN: https://doi.org/10.1016/j.ijggc.2018.05.014
Abstract:

The Calcium Looping (CaL) process is a promising technology for post-combustion CO2 capture from fossil-fired power plants and carbon intense industry. Within a CaL system, a limestone based sorbent stream is forced to circulation between two interconnected circulating fluidized bed (CFB) reactors. The main part of the CO2, contained in the flue gas stream is absorbed by CaO within the carbonator, whereas it is released during regeneration in the oxy-fired calciner. The feasibility of this technology was proven by numerous experimental investigations in semi-industrial scale. The next step in the development of this technology is expected to be a demonstration plant in the scale of approximately 20 MWth. The focus of this paper is the determination of the heat and mass balances and the assessment of the operability of a newly designed 20 MWth CaL demonstration plant. The investigations are based on a steady-state process model, which has been validated by experimental data from 1 MWth pilot tests. The aspect of solid entrainment during part load operation are addressed. In the present design case, a stable operation of the demonstration plant at 40 % equivalent carbonator load is feasible without additional flue gas recirculation.

Uncontrolled Keywords: CCS, CO2 capture, Calcium looping, Process modelling, Circulating fluidized bed
Divisions: 16 Department of Mechanical Engineering
16 Department of Mechanical Engineering > Institut für Energiesysteme und Energietechnik (EST)
Profile Areas
Profile Areas > Thermo-Fluids & Interfaces
Date Deposited: 29 Jun 2018 15:52
Last Modified: 29 Jun 2018 15:52