TU Darmstadt / ULB / TUbiblio

Browse by Person

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: No Grouping | Item Type | Date | Language
Jump to: 2013 | 2012
Number of items: 4.

2013

Gwildis, U. and Newby, J. and Cochran, J. and Maday, L. (2013):
Considerations for Mechanized Tunneling in Glacial Geology.
In: Association of Environmental & Engineering Geologists (AEG) 56th Annual Meeting, Seattle, 08.-15.09.2013, [Conference or Workshop Item]

2012

Clare, J. and Gwildis, U. and Cochran, J. and Mageau, D. and Hauser, G. (2012):
What to do when a TBM is stopped 320 feet deep below a residential neighborhood and 10,000 feet from the nearest shaft? - Brightwater Conveyance System Final Design Project, King County, Washington.
In: ASCE Seattle Section Geotechnical Group Dinner Lecture, Seattle, 25.10.2012, [Conference or Workshop Item]

Hauser, G. and Cochran, J. and Cole, M. and Gwildis, U. and Trisi, W. and Olsen, G. and Shinouda, M. (2012):
Brightwater BT-3 Tunnel Completion: Extending the BT-4 Earth Pressure Balance Drive in Complex Glacial Geology.
In: North American Tunneling (NAT) Conference 2012, Indianapolis, 24.-27.06.2012, [Conference or Workshop Item]

Gwildis, U. and Cochran, J. and Clare, J. and Mageau, D. and Hauser, G. (2012):
Use of Ground Freezing for Connecting two Tunnel Boring Machine-Driven Tunnels 300 Feet Underground.
In: North American Tunneling (NAT) Conference 2012, Indianapolis, 24.-27.06.2012, [Conference or Workshop Item]

This list was generated on Sat Jul 13 00:19:27 2019 CEST.