TU Darmstadt / ULB / TUbiblio

Cooperative Design Methods for Energy Active Facade Elements Based on BIMserver and Multi-Agent-Services using JADE

Wagner, Anna ; Rüppel, Uwe
Slusarczyk, Grazyna ; Strug, Barbara ; de Wilde, Pieter (eds.) :

Cooperative Design Methods for Energy Active Facade Elements Based on BIMserver and Multi-Agent-Services using JADE.
In: 23rd EG-ICE International Workshop, 29. June - 01. July 2016, Kraków, Poland. Proceedings of the 23rd International Workshop of the European Group for Intelligent Computing in Engineering
[ Konferenzveröffentlichung] , (2016)

Kurzbeschreibung (Abstract)

The renewable energies expansion is increasing worldwide. To satisfy the demand, large surface areas converting wind and solar power are needed. Accessible areas on building envelopes provide potential. However, various problems complicate the application of active façade elements. They need to be planned and integrated as early as possible, implying assumptions to be made. Also, cooperation among different stakeholders is necessary and needs to be organised. Small alterations of the building design can have an impact on an elements’ efficiency. This work presents a methodology to solve these problems. Presented is an innovative softwareengineering approach using a BIMserver storing building models and a multi-agent-systems (MAS) establishing intelligence on a collaboration platform. The developed methodology allows an easy and early integration of energy active façade elements into a building’s processes, and is transferrable to other problems in civil-engineering. This paper discusses the platform’s structure with its focus on the MAS.

Typ des Eintrags: Konferenzveröffentlichung
Erschienen: 2016
Herausgeber: Slusarczyk, Grazyna ; Strug, Barbara ; de Wilde, Pieter
Autor(en): Wagner, Anna ; Rüppel, Uwe
Titel: Cooperative Design Methods for Energy Active Facade Elements Based on BIMserver and Multi-Agent-Services using JADE
Sprache: Englisch
Kurzbeschreibung (Abstract):

The renewable energies expansion is increasing worldwide. To satisfy the demand, large surface areas converting wind and solar power are needed. Accessible areas on building envelopes provide potential. However, various problems complicate the application of active façade elements. They need to be planned and integrated as early as possible, implying assumptions to be made. Also, cooperation among different stakeholders is necessary and needs to be organised. Small alterations of the building design can have an impact on an elements’ efficiency. This work presents a methodology to solve these problems. Presented is an innovative softwareengineering approach using a BIMserver storing building models and a multi-agent-systems (MAS) establishing intelligence on a collaboration platform. The developed methodology allows an easy and early integration of energy active façade elements into a building’s processes, and is transferrable to other problems in civil-engineering. This paper discusses the platform’s structure with its focus on the MAS.

Buchtitel: Proceedings of the 23rd International Workshop of the European Group for Intelligent Computing in Engineering
Freie Schlagworte: BIM, MAS, Versionierung, Versioning
Fachbereich(e)/-gebiet(e): 13 Fachbereich Bau- und Umweltingenieurwissenschaften > Institut für Numerische Methoden und Informatik im Bauwesen
13 Fachbereich Bau- und Umweltingenieurwissenschaften
Veranstaltungstitel: 23rd EG-ICE International Workshop
Veranstaltungsort: Kraków, Poland
Veranstaltungsdatum: 29. June - 01. July 2016
Hinterlegungsdatum: 29 Aug 2016 14:44
Export:

Optionen (nur für Redakteure)

Eintrag anzeigen Eintrag anzeigen