TU Darmstadt / ULB / TUbiblio

Testing Requirements and Actual lEC Work on Distribution and Transmission Line Arresters

Hinrichsen, Volker (2008):
Testing Requirements and Actual lEC Work on Distribution and Transmission Line Arresters.
In: Cigré Colloquium "Application of Line surge Arresters in Power Distribution and Transmission Systems", Cavtat, Croatia, May 26 to 29 2008, [Conference or Workshop Item]

Item Type: Conference or Workshop Item
Erschienen: 2008
Creators: Hinrichsen, Volker
Title: Testing Requirements and Actual lEC Work on Distribution and Transmission Line Arresters
Language: English
Divisions: 18 Department of Electrical Engineering and Information Technology > Institute for Electrical Power Systems > High Voltage Technology
18 Department of Electrical Engineering and Information Technology
18 Department of Electrical Engineering and Information Technology > Institute for Electrical Power Systems
Event Title: Cigré Colloquium "Application of Line surge Arresters in Power Distribution and Transmission Systems"
Event Location: Cavtat, Croatia
Event Dates: May 26 to 29 2008
Date Deposited: 16 Mar 2009 13:23
Export:

Optionen (nur für Redakteure)

View Item View Item